flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Flagler Health+ Campus breaks ground in Durbin Park

Healthcare Facilities

New Flagler Health+ Campus breaks ground in Durbin Park

Gresham Smith designed the project.


By David Malone, Associate Editor | June 29, 2021
Flagler Health+ emergency department exterior
Flagler Health+ emergency department exterior

The new 41.5-acre Flagler Health+ campus in St. Johns County’s Durbin Park development has broken ground.

The health and wellness campus will feature a hospital and outpatient surgery center and a signature Flagler Health+ Village concept. The health village will incorporate family medicine, specialty care, urgent care, imaging, laboratory services, healthy lifestyle programming, and community engagement space with an emphasis on integrating nature and technology to enhance experiences. The campus will also feature a wellness facility, walking trails, and retail offerings.

 

Flagler Health+ campus

 

Flagler Health+ Durbin Park is located between Interstate 95 and State Road 9B. It is part of GATE Lands’ larger Durbin Park Development. “We are creating a premier health and wellness destination. The campus has been designed to create a sense of community, deliver uniquely personalized experiences, and achieve the best possible health outcomes for all people,” said Flagler Health+ President and CEO Jason Barrett, in a release.

Outpatient clinical services are slated to open in early 2023. The entire three-phase project is expected to complete in 2027.

 

Flagler Health+ campus exterior

Related Stories

Healthcare Facilities | Jun 27, 2023

A woman-led CM team manages the expansion and renovation of a woman-focused hospital in Nashville

This design-build project includes adding six floors for future growth.

Standards | Jun 26, 2023

New Wi-Fi standard boosts indoor navigation, tracking accuracy in buildings

The recently released Wi-Fi standard, IEEE 802.11az enables more refined and accurate indoor location capabilities. As technology manufacturers incorporate the new standard in various devices, it will enable buildings, including malls, arenas, and stadiums, to provide new wayfinding and tracking features.

Healthcare Facilities | Jun 14, 2023

Design considerations for behavioral health patients

The surrounding environment plays a huge role in the mental state of the occupants of a space, especially behavioral health patients whose perception of safety can be heightened. When patients do not feel comfortable in a space, the relationships between patients and therapists are negatively affected.

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

Healthcare Facilities | Jun 5, 2023

Modernizing mental health care in emergency departments: Improving patient outcomes

In today’s mental health crisis, there is a widespread shortage of beds to handle certain populations. Patients may languish in the ED for hours or days before they can be linked to an appropriate inpatient program. 

Healthcare Facilities | Jun 1, 2023

High-rise cancer center delivers new model for oncology care

Atlanta’s 17-story Winship Cancer Institute at Emory Midtown features two-story communities that organize cancer care into one-stop destinations. Designed by Skidmore, Owings & Merrill (SOM) and May Architecture, the facility includes comprehensive oncology facilities—including inpatient beds, surgical capacity, infusion treatment, outpatient clinics, diagnostic imaging, linear accelerators, and areas for wellness, rehabilitation, and clinical research.

Healthcare Facilities | May 19, 2023

A new behavioral health facility in California targets net zero energy

Shortly before Mental Health Awareness Month in May, development and construction firm Skanska announced the topping out of California’s first behavioral health facility—and the largest in the nation—to target net zero energy. Located in Redwood City, San Mateo County, Calif., the 77,610-sf Cordilleras Health System Replacement Project is slated for completion in late 2024.

3D Printing | May 12, 2023

World’s first 3D-printed medical center completed

3D construction printing reached new heights this week as the world’s first 3D-printed medical center was completed in Thailand.

Sustainability | May 11, 2023

Let's build toward a circular economy

Eric Corey Freed, Director of Sustainability, CannonDesign, discusses the values of well-designed, regenerative buildings.

Digital Twin | May 8, 2023

What AEC professionals should know about digital twins

A growing number of AEC firms and building owners are finding value in implementing digital twins to unify design, construction, and operational data.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021