flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New flight pattern: Google, Spruce Goose

Reconstruction Awards

New flight pattern: Google, Spruce Goose

The hangar that once housed the Spruce Goose is adapted to meet a tech giant’s workplace needs.


By John Caulfield, Senior Editor | December 12, 2019
Google, Spruce Goose

Photo: Connie Zhou

Since 2016, Google has leased the seven-story, 750-foot-long hangar where, in 1943, Howard Hughes housed his all-wood-body Hercules IV airplane, the “Spruce Goose.”

The project team recreated this space into a four-story building within a building comprised of office, meeting, and event areas, as well as employee amenities, which unify the existing campus.

The hangar’s original 75-foot-high glulam arches and wood sidings were preserved and exposed to the interior. Twenty thousand three-foot-long, half-inch-diameter screws secure the arches and wood structure. The all-wood spine that supports the ceiling was deconstructed and rebuilt with noncombustible materials that were reclad with refurbished wood panels.

The project’s complexity included running six miles of conduit underground around 1,500 piles.

To promote user engagement, the main circulation on each level was formed into a zigzag, bridging the spine and two sides of the hangar. A “boardwalk” connects the interior structure from the ground floor to the third level.

 

HONORABLE MENTION

BUILDING TEAM ZGF Architects (submitting firm, architect) Google (owner/developer) Arup (SE, MEP) MATT Construction (GC, CM) DETAILS 450,000 sf Total cost Confidential Construction time August 2016 to July 2018 Delivery method CM at risk

Related Stories

Reconstruction Awards | Nov 26, 2018

Yarn works: Neverending yarn

111-year-old mill becomes a mixed-income multifamily community.

Reconstruction Awards | Nov 20, 2018

Wiseburn High School: New kind of P3

A California school district and a charter school system join forces to open a skills-based high school.

Reconstruction Awards | Nov 19, 2018

Kehoe Iron Works: Industrial strength makeover

A project team turns a toxic site into a civic treasure.

Reconstruction Awards | Nov 19, 2018

Weiser Hall, University of Michigan: Campus upgrade

A Mid-century building becomes home to a new International Institute.

Reconstruction Awards | Nov 16, 2018

Mass MoCA Building 6: The Robert W. Wilson Building

A textile mill becomes an arts center that energizes a New England town and its region.

Reconstruction Awards | Nov 15, 2018

Charles L. Tutt Library, Colorado College: Net-zero in the Rockies

Library expansion reinforces Colorado College’s commitment to carbon neutrality.

Reconstruction Awards | Nov 14, 2018

National Arts Centre: O, Canada

Three new wings and a flashy AV display add luster to the nation’s cultural gem.

Reconstruction Awards | Nov 13, 2018

20 Times Square: Conquering Times Square

The 20 Times Square mixed-used project at the corner of 47th and Seventh Avenue is indicative of the great lengths Building Teams will go in order to maximize real estate and media opportunities in Times Square.

Reconstruction Awards | Nov 12, 2018

Crosstown Concourse: An 'organic' urban village

Memphians band together to rebuild a gigantic Sears distribution facility into a multifaceted community crossroads.

Reconstruction Awards | Nov 12, 2018

Cincinnati Music Hall: Saving a cultural anchor

Cincinnati uses ‘skillful triage’ to bring its endangered Music Hall up to date.

boombox1
boombox2
native1

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021