Since 2016, Google has leased the seven-story, 750-foot-long hangar where, in 1943, Howard Hughes housed his all-wood-body Hercules IV airplane, the “Spruce Goose.”
The project team recreated this space into a four-story building within a building comprised of office, meeting, and event areas, as well as employee amenities, which unify the existing campus.
The hangar’s original 75-foot-high glulam arches and wood sidings were preserved and exposed to the interior. Twenty thousand three-foot-long, half-inch-diameter screws secure the arches and wood structure. The all-wood spine that supports the ceiling was deconstructed and rebuilt with noncombustible materials that were reclad with refurbished wood panels.
The project’s complexity included running six miles of conduit underground around 1,500 piles.
To promote user engagement, the main circulation on each level was formed into a zigzag, bridging the spine and two sides of the hangar. A “boardwalk” connects the interior structure from the ground floor to the third level.
HONORABLE MENTION
BUILDING TEAM ZGF Architects (submitting firm, architect) Google (owner/developer) Arup (SE, MEP) MATT Construction (GC, CM) DETAILS 450,000 sf Total cost Confidential Construction time August 2016 to July 2018 Delivery method CM at risk
Related Stories
Reconstruction Awards | Dec 1, 2017
Rescue mission: Historic movie palace is now the centerpiece of Baltimore’s burgeoning arts hub
In restoring the theater, the design team employed what it calls a “rescued ruin” preservation approach.
Reconstruction Awards | Dec 1, 2017
Gothic revival: The nation’s first residential college is meticulously restored
This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition.
Reconstruction Awards | Dec 1, 2017
Rockefeller remake: Iconic New York tower is modernized for its next life
To make way for new ground-floor retail and a more dramatic entrance and lobby, the team removed four columns at the ground floor.
Reconstruction Awards | Nov 30, 2017
BD+C's 2017 Reconstruction Award Winners
Provo City Center Temple, the Union Trust Building, and the General Motors Factory One are just a few of the projects recognized as 2017 Reconstruction Award winners.
Reconstruction Awards | Nov 29, 2017
College credit: Historic rehab saves 50% on energy costs
The project team conducted surveys of students, faculty, and staff to get their input.
Reconstruction Awards | Nov 29, 2017
Amazing grace: Renovation turns a church into elegant condos
The windows became The Sanctuary’s chief sales edge.
Reconstruction Awards | Nov 28, 2017
Broadway melody: Glass walls set just the right tone for a historic lobby in Lower Manhattan
The adaptation of the 45,000-sf neoclassical lobby at 195 Broadway created three retail spaces and a public walkway.
Reconstruction Awards | Nov 27, 2017
Higher education: The rebirth of a Washington, D.C., high school
The project team, led by architect Perkins Eastman, restored the original cupola.
Reconstruction Awards | Nov 27, 2017
Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer
The project team had to fix poor renovations made in the ’50s.
Reconstruction Awards | Nov 27, 2017
Patient friendly: The University of Chicago Medicine Center for Care and Discovery adds 203 new beds
Strict infection control and life safety measures were implemented to protect patients on other floors as work proceeded.