flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Frank Gehry project on Sunset Boulevard moves forward with a few compromises

Mixed-Use

New Frank Gehry project on Sunset Boulevard moves forward with a few compromises

Among the compromises, the 8150 Sunset Blvd. project will see its tallest residential tower reduced by 56 feet.


By David Malone, Associate Editor | October 31, 2016

Rendering courtesy of Visualhouse.

A planned mixed-use development from Frank Gehry and located on Sunset Boulevard will be moving forward after the Planning and Land Use Management Committee voted unanimously to approve the plans.

As the Los Angeles Times reports, however, a few compromises were required before the project could move forward. As it stands now, the project consists of two residential towers comprising 229 units (38 of which are for low-income residents), 65,000 sf of commercial space, and a pedestrian plaza. The project arrived at these numbers after the area’s councilman, David Ryu, said he would not support the development unless the 15-story residential tower was downsized, included more affordable housing units, and had additional parking spots added.

All of these conditions were met causing the tower to shrink from 234 feet to 178 feet, the number of parking spots to increase to 494, and the sidewalks to widened to 15 feet.

Even with the compromises, including the smaller size that makes the new tower more in line with the height of surrounding buildings, some neighboring residents are expressing a bout of NIMBYism. They believe the development will still be out of scale with the surrounding area, will ruin their views, and may produce heavy traffic in the area due to all of the new residents. Despite their concerns, the scaled-back project is moving forward.

Tags

Related Stories

Mixed-Use | Sep 23, 2020

SOM-designed waterfront neighborhood will include 1,045-foot-tall tower

The project will focus on harnessing the sea and the sun to create a low-carbon waterfront community.

Mixed-Use | Sep 7, 2020

Google proposes 40-acre redevelopment that includes nearly 2,000 housing units

Lendlease will manage the design and construction, as a partner in a multi-development deal struck last year between the two companies.

Mixed-Use | Sep 3, 2020

10 Design will redevelop the Nanjing Dajiaochang Airport

The old military airport will become a contemporary mixed-use destination.

Mixed-Use | Aug 17, 2020

New Sydney towers will have the world’s first AI-driven facade system

SOM and Fender Katsalidis are designing the project.

Mixed-Use | Aug 4, 2020

San Jose’s new tallest building tops out

Steinberg Hart designed the project.

Mixed-Use | Jul 27, 2020

$92 million reconstruction of St. Petersburg Municipal Pier completes

Rogers Partners, ASD | SKY, and landscape architect Ken Smith Workshop designed the project.

Mixed-Use | Jul 22, 2020

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

The 800,000-gsf mixed-use project is located at 10660 NE 8th Street.

Mixed-Use | Jul 21, 2020

Phase one of The Orbit masterplan detailed for Innisfil, Ontario

Partisans is designing the project.

Mixed-Use | Jul 20, 2020

J. Small Investments, Lyda Hill Philanthropies have unveiled plans for a 23-acre mixed-use development in Dallas

The vacant campus was purchased from ExxonMobil Oil Corporation in 2015.

Mixed-Use | Jul 17, 2020

Ryan Companies breaks ground on 122-acre Highland Bridge redevelopment in St. Paul, Minn.

The community’s goal is to provide 100% renewable energy to its houses and businesses.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021