flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Heart and Vascular Tower set to open at Atrium Health NorthEast

Healthcare Facilities

New Heart and Vascular Tower set to open at Atrium Health NorthEast

Robins & Morton provided construction services for the project.


By David Malone, Associate Editor | August 5, 2019
Aerial view of Atrium Helath NorthEast's new Heart and Vascular Tower
Aerial view of Atrium Helath NorthEast's new Heart and Vascular Tower

Heart and Vascular Tower, Atrium Health NorthEast’s newest addition, is a 60-bed, 163,000-sf patient tower in Concord, N.C., that recently celebrated its grand opening on July 25.

The $115.2 million building will house the new Sanger Heart and Vascular Institute, interventional radiology services, catheterization labs, electrophysiology labs, pre- and post-op care services, and a cardiovascular intensive care unit. Previously, heart and radiology services were spread across the hospital’s campus, meaning the new building will allow doctors to treat patients more quickly.

Heart and Vascular Tower was designed and built using feedback from hospital staff, the community, former patients, and caretakers to create the most accessible and efficient building possible. 

The tower will officially open to patients in mid-August.

Related Stories

Healthcare Facilities | Oct 29, 2018

Outpatient clinics bring the VA closer to injured veterans

The Department of Veterans Affairs is making efforts to improve its construction management and align its design guidelines to industry standards.

Healthcare Facilities | Oct 22, 2018

WSP-HKS JV signs deal for U.S. Navy construction work

The contract is not exclusive to the two firms, but it lets NAVFAC assign certain projects to them.

Healthcare Facilities | Oct 12, 2018

N.Y. builder pushes to get military trauma centers up and running quicker

To date, seven NICoE Spirit satellite centers have been built on the grounds of Fort Belvoir in Virginia, Camp Lejeune and Fort Bragg in North Carolina, Fort Campbell in Kentucky, Fort Hood in Texas, Joint Base Lewis-McChord in Washington, and Camp Pendleton in California.

Healthcare Facilities | Sep 7, 2018

Medical office construction isn’t keeping pace with the aging of America

A new Transwestern report suggests a “rethinking” of healthcare delivery approaches that lean heavier on technology.

Engineers | Aug 22, 2018

An electrical engineer’s take on designing successful pharmaceutical lab space

Patrick Licklider, PE, CEM, GGP, LEED AP BD+C, an electrical engineer in Clark Nexsen’s Science + technology practice, shares his perspective on what it takes to successfully design laboratory and manufacturing environments for the fast-changing pharmaceutical and biotech industry.

Healthcare Facilities | Aug 3, 2018

Seismic deadlines approaching for healthcare companies

California hospitals can save money with a holistic approach to retrofit issues.

Healthcare Facilities | Jul 30, 2018

Best in healthcare design 2018: Seven projects win AIA/AAH Healthcare Design Awards

The Steven Holl-designed Maggie’s Centre Barts cancer treatment facility in London highlights the honorees of the AIA Academy of Architecture for Health 2018 Healthcare Design Awards.

Healthcare Facilities | Jul 26, 2018

Healthcare market trends 2018: Health systems get leaner, more resilient

Hospitals set their sights on improving patient convenience and operational efficiency.

Healthcare Facilities | Jul 11, 2018

5 ways design is transforming behavioral healthcare

Circadian lighting, calming materials, and transparency are helping to normalize the patient experience in behavioral healthcare.

Healthcare Facilities | Jul 10, 2018

HGA designs acute care hospital for MetroHealth in Cleveland

The facility’s master plan creates a ‘hospital in a park.’

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021