555 Howard, a ground-up mixed-use tower, is looking to bring an additional 69 rental units and a 255-room hotel to San Francisco’s Transbay neighborhood.
The glass curtain-walled tower will offer residents and guests ballroom facilities, a spa and fitness center, a ground floor restaurant, a 1,763-sf public sky bar on the 36th floor, and a 5,047-sf public rooftop terrace. Guests will be welcomed into the building by a three-story lobby atrium.
The hotel will occupy approximately 206,562 sf across floors 1 through19 and B1 through B3. The residential units will occupy approximately 150,275 sf on floors 1 (residential lobby) and 20 through 36. On the 21st floor, the curtain wall steps back to create an outdoor terrace for building residents.
Four proposed underground levels will include 70 parking spaces and 95 Class I bicycle parking spaces. An additional 25 Class II bicycle spaces will be located along the Howard Street sidewalk.
Across all floors, 555 Howard offers 358,600 sf of GSF.
A reinforced mat foundation, eight feet thick at the northwest and southeast sides of the tower and 12 feet thick at the tower core, was recommended upon investigation of the build site. Plenty of attention will be given to the building’s foundation to avoid a similar outcome as Millennium Tower, the San Francisco tower that has become infamous for its flawed foundation work.
555 Howard was designed to meet LEED Platinum requirements. The project is expected to take three years to complete from groundbreaking and is being developed by Pacific Eagle and designed by Renzo Piano Building Workshop.
Rendering courtesy of Steelblue.
Rendering courtesy of Steelblue.
Rendering courtesy of Steelblue.
Rendering courtesy of Steelblue.
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.
| Apr 3, 2012
Luxury hotel 'groundscraper' planned in abandoned quarry
Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.