5 Garret Mountain Plaza, a New Jersey office building located at a four-way interchange of I-80, is set to undergo a substantial renovation that will offer a blank canvas for companies seeking technologically advanced office space and amenities.
The 101,880-sf building is approaching the renovations with a “live-work-play” mentality. The renovations will include a full-service café, fitness center, conference center, and rooftop deck. Surrounding the building will be landscaping, nature trails, and views of Garret Mountain Reservation.
“Today’s workforce is younger than ever before, and companies often are challenged to find buildings that offer millennial employees a collaborative, productive work environment backed by a full complement of dynamic lifestyle amenities and conveniences,” says David Simson, Vice-Chairman and CEO of Newmark Knight Frank, the building’s leasing agent.
The building is seeking a sole tenant or a lead tenant of at least 50,000 sf. 5 Garret Mountain Plaza is part of a larger campus that includes two other buildings and a total of 401,000 sf of office space.
The building was originally 100% leased to Cytec Industries, a chemicals and materials technology company, and has not been available since it was built in the early 1980s.
Mountain Development Corp. owns the three-building campus.
Related Stories
| Apr 3, 2012
Blaine Brownell on innovative materials applications in architecture
Brownell, who was named a BD+C 40 Under 40 in 2006, provides insight regarding emerging material trends and the creative implementation of materials.
| Mar 12, 2012
Improving the performance of existing commercial buildings: the chemistry of sustainable construction
Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.
| Mar 6, 2012
Joliet Junior College achieves LEED Gold
With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.
| Mar 1, 2012
Reconstruction of L.A.’s Dunbar Hotel underway
Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.
| Feb 26, 2012
Milwaukee U-Haul facility receives LEED-CI Silver
The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.