flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Jersey office building will undergo ‘live-work-play’ renovation

Reconstruction & Renovation

New Jersey office building will undergo ‘live-work-play’ renovation

The 100,000-sf building is part of a three-building, 30-acre campus.


By David Malone, Associate Editor | July 31, 2017
The exterior of 5 Garret Mountain Plaza

Courtesy of Mountain Development

5 Garret Mountain Plaza, a New Jersey office building located at a four-way interchange of I-80, is set to undergo a substantial renovation that will offer a blank canvas for companies seeking technologically advanced office space and amenities.

The 101,880-sf building is approaching the renovations with a “live-work-play” mentality. The renovations will include a full-service café, fitness center, conference center, and rooftop deck. Surrounding the building will be landscaping, nature trails, and views of Garret Mountain Reservation.

“Today’s workforce is younger than ever before, and companies often are challenged to find buildings that offer millennial employees a collaborative, productive work environment backed by a full complement of dynamic lifestyle amenities and conveniences,” says David Simson, Vice-Chairman and CEO of Newmark Knight Frank, the building’s leasing agent.

The building is seeking a sole tenant or a lead tenant of at least 50,000 sf. 5 Garret Mountain Plaza is part of a larger campus that includes two other buildings and a total of 401,000 sf of office space.

The building was originally 100% leased to Cytec Industries, a chemicals and materials technology company, and has not been available since it was built in the early 1980s.

Mountain Development Corp. owns the three-building campus.

Related Stories

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 27, 2011

Suffolk Construction celebrates raising of Boston Tea Party Ships & Museum cupola

Topping off ceremony held on 238th Anniversary of Boston Tea Party.

| Dec 21, 2011

Hoboken Terminal restoration complete

Restoration of ferry slips, expanded service to benefit commuters.

| Dec 20, 2011

Aragon Construction leading build-out of foursquare office

The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.

| Dec 19, 2011

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.

| Dec 19, 2011

Summit Design+Build selected as GC for Chicago recon project

The 130,000 square foot building is being completely renovated.

| Dec 12, 2011

Skanska to expand and renovate hospital in Georgia for $103 Million

The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.



Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021