flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Medpace headquarters tower supports wellness culture

Projects

New Medpace headquarters tower supports wellness culture

Gresham Smith-designed facility rises seven stories in Cincinnati with fitness center, street-level shops and a parking garage.


By Peter Fabris, Contributing Editor  | February 22, 2022
Medpace HQ
Medpace's campus includes walkable paths, retails, and restaurants. Courtesy Gresham Smith.

The new 263,000 sf, seven-story global headquarters of Medpace, an organization conducting global clinical research for the development of medical therapeutics and devices, reflects its active wellness culture.

The Gresham Smith-designed facility embraces the firm’s vision of an interconnected campus with walkable paths, retail, restaurants, and daily, health-related activities. A 5,000 sf state-of-the-art fitness center graces the building’s second floor with sweeping views of the city. A wide, centralized staircase connects employees to nature with outside views and daylighting, providing encouragement for employees to take the stairs instead of the elevator.

Medpace Exterior
Rainbow columns highlight the exterior of the Medpace building. Courtesy Gresham Smith.


 The focal point at the terminus of the lobby, the stairway also acts as a connector to social spaces—including breakrooms, lounge, and meeting spaces. The glazing at the stairwell atrium boasts a six-story custom LED art installation designed by world-renowned LED artist Erwin Redl. It features 10-foot x 10-foot panels illuminated by changeable, multi-colored LED lights. This feature, the “Medpace Matrix,” brings the exterior to life, especially at night, while creating a unique interactive experience that can be viewed from different levels inside.

Medpace Interior
The focal point of the lobby is the stairway. Courtesy Gresham Smith.


First-floor retail spaces blend with the Madisonville neighborhood’s ethos—a culturally rich and vibrant area. To allow for privacy within an open-office concept, the design uses architectural features to punctuate large expanses, avoiding a sea-of-workstations effect. Offices and conference rooms are situated in the center of the building, with workstations placed in open areas around the perimeter. A spacious workstation layout incorporates gallery walls on two sides, allowing for seated privacy with enough openness for daylighting and views.
 
Other features include light-filled, vibrant-hued break areas on each floor that provide floor-to-ceiling views to natural surroundings. Plantings adorn a wall above the banquette seating. Both private offices and open offices throughout the floor plan offer sweeping views to the natural vistas outside.

Medpace Interior Break Room
Break rooms are essential features inside the Medpace facility. Courtesy Gresham Smith.


The striking two-story, 900-space rainbow-colored parking garage goes far beyond utilitarian, giving a nod to the locally celebrated rainbow columns on-site. Gresham Smith’s design team created a garage cladding that captures the history of place. Framed canvas elements at both the north and south ends of the garage will be used for rotating public art installations.

Break Area Design
Different colored break areas are designed throughout the facility. Courtesy Gresham Smith.


 
“Employee feedback on the new headquarters has been so overwhelmingly positive that Medpace has made our interior design the standard for its facilities worldwide,” according to Gresham Smith.

Medpace Meeting Spaces
Employees have truly appreciated the design of the facility, and different features they have to enjoy. Courtesy Gresham Smith.


 Owner and/or developer: RBM Development Company, LLC
Design architect: Gresham Smith
Architect of record: Gresham Smith
MEP engineer: Gresham Smith
Structural engineer: Gresham Smith
General contractor/construction manager: Skanska

Tags

Related Stories

| May 1, 2013

World’s tallest children’s hospital pushes BIM to the extreme

The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.

| Apr 22, 2013

Top 10 green building projects for 2013 [slideshow]

The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.

| Feb 28, 2013

Greeening Silicon Valley: Samsung's new 1.1 million-sf HQ

Samsung Electronics' new 1.1 million sf San Jose campus will support at least 2,500 sales and R&D staff in the company's semiconductor and display businesses.

| Feb 27, 2013

Bronx residents get LEED Platinum public housing complex, rooftop farm

The New York City Housing Authority has opened Arbor House, a 124-unit LEED Platinum complex in the Morrisania neighborhood of the Bronx.

| Feb 22, 2013

Starbucks pilot program rolls out small, modular stores

Coffee giant Starbucks is rolling out mini-stores with maximum local flavor, as part of an international pilot program.

| Oct 23, 2012

Transwestern to develop industrial complex in Houston’s Energy Corridor

Transwestern, a commercial real estate firm, has acquired 30 acres in Houston’s Energy Corridor for a 384,900-sf industrial project, the company announced.

| Jul 25, 2012

Contract awarded for Gaillard Municipal Auditorium renovations in Charleston, S.C.

Seeking LEED Silver certification, the project will begin in August and is slated for completion in December 2014.

| Jul 24, 2012

Dragon Valley Retail at epicenter of Yongsan International Business District

Masterplanned by architect Daniel Libeskind, the Yongsan IBD encompasses ten city blocks and includes a collection of high-rise residences and commercial buildings.

| Jul 24, 2012

$20 Million expansion at New Orleans casino announced

150-room hotel project to include suites, fitness center, and meeting space.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021