flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New mixed-use development breaks ground in Miami Beach

Mixed-Use

New mixed-use development breaks ground in Miami Beach

Domo Studio is designing the project and Origin Construction is the general contractor.


By David Malone, Managing Editor | November 11, 2021
Eighteen Sunset exterior
Courtesy Domo Studio

Eighteen Sunset, a new mixed-use development, has broken ground in Miami Beach. The five-story building will include street-level retail and restaurant spaces, two floors of Class A+ offices, and an exclusive top-floor penthouse home with a private rooftop deck.

The ground floor will total approximately 17,000 sf of rentable commercial space split into four areas ranging in size and offering retail and restaurant concepts in a selection of spaces to choose from. A central breezeway and cantilevered sidewalk cover will feature an expansive outdoor covered sidewalk and breezeway spaces designed to encourage community wellness.

The offices will be on floors three and four and will comprise approximately 40,000-sf and feature thirteen-foot ceilings, large exterior deck spaces, an architectural overhang, and floor-to-ceiling windows. Office tenants will have secure parking on the building’s second floor.

A penthouse residence includes more than 15,000 sf of interior space as well as a rooftop pool deck. In total, the residence includes approximately 30,000 sf of private indoor and outdoor space, including a hot tub, outdoor dining room, expansive gardens, and seating and recreational areas.

Eighteen Sunset is located between Purdy Avenue and Bay Road and will offer walkability and accessibility in the heart of Sunset Harbor. The project is anticipated to achieve LEED Gold certification and is slated for completion in spring 2023. Deco Capital Group is the developer.

Tags

Related Stories

Mixed-Use | Sep 18, 2017

Urban heartbeat: Entertainment districts are rejuvenating cities and spurring economic growth

Entertainment districts are being planned or are popping up all over the country.

Mixed-Use | Sep 14, 2017

Capital One eschews the traditional bank with the Capital One Café

The new branch in downtown Santa Monica offers 8,400 sf of space designed by Gwynne Pugh Urban Studio.

Libraries | Sep 1, 2017

Johnson Favaro selected to design new main library in Riverside, Calif.

The choice comes after a 12-year planning process and a yearlong selection process.

Mixed-Use | Aug 30, 2017

Former industrial building becomes 'lifestyle community' in ever-evolving Baltimore

The new community offers 292 apartments with 20,000 sf of retail space.

Mixed-Use | Aug 30, 2017

A 50-acre waterfront redevelopment gets under way in Tampa

Nine architects, three interior designers, and nine contractors are involved in this $3 billion project.

Mixed-Use | Aug 18, 2017

Covington, Wash., greenlights a 214-acre mixed-use development

A peninsula will extend into the property’s 20-acre lake and contain retail shops, restaurants, a pavilion park, homes, and green space.

Mixed-Use | Aug 17, 2017

Manhattan’s Union Square gets its very own farmhouse

GrowNYC, a sustainability-focused nonprofit, commissioned ORE Design to create the community events center and learning space.

Mixed-Use | Aug 15, 2017

A golf course community converts into an agrihood with 1,150 homes and a working olive grove

The community will cover 300 acres in Palm Springs, Calif.

Mixed-Use | Aug 10, 2017

Mixed-use development includes University of California-San Diego campus extension

The 562,000-sf development was designed by Carrier Johnson + CULTURE and is located five blocks from the San Diego Padres’ Petco Park.

Mixed-Use | Aug 9, 2017

Mixed-use development will act as a gateway to Orange County’s ‘Little Saigon’

The development will include apartments, ground-floor retail, and a five-story hotel.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021