flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New mixed-use development breaks ground in Miami Beach

Mixed-Use

New mixed-use development breaks ground in Miami Beach

Domo Studio is designing the project and Origin Construction is the general contractor.


By David Malone, Managing Editor | November 11, 2021
Eighteen Sunset exterior
Courtesy Domo Studio

Eighteen Sunset, a new mixed-use development, has broken ground in Miami Beach. The five-story building will include street-level retail and restaurant spaces, two floors of Class A+ offices, and an exclusive top-floor penthouse home with a private rooftop deck.

The ground floor will total approximately 17,000 sf of rentable commercial space split into four areas ranging in size and offering retail and restaurant concepts in a selection of spaces to choose from. A central breezeway and cantilevered sidewalk cover will feature an expansive outdoor covered sidewalk and breezeway spaces designed to encourage community wellness.

The offices will be on floors three and four and will comprise approximately 40,000-sf and feature thirteen-foot ceilings, large exterior deck spaces, an architectural overhang, and floor-to-ceiling windows. Office tenants will have secure parking on the building’s second floor.

A penthouse residence includes more than 15,000 sf of interior space as well as a rooftop pool deck. In total, the residence includes approximately 30,000 sf of private indoor and outdoor space, including a hot tub, outdoor dining room, expansive gardens, and seating and recreational areas.

Eighteen Sunset is located between Purdy Avenue and Bay Road and will offer walkability and accessibility in the heart of Sunset Harbor. The project is anticipated to achieve LEED Gold certification and is slated for completion in spring 2023. Deco Capital Group is the developer.

Tags

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021