flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

Mixed-Use

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

The 23-story building provides 254 new residential units, along with ground-floor retail.


By Peter Fabris, Contributing Editor | October 7, 2024
Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang

Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.

Verde, intended to be Mission Rock’s central social hub, takes its name from distinctive, green-colored glazed ceramic cladding that allows for variations in color and depth at multiple scales. The 23-story building provides 254 new residential units—59 of which are designated for middle-income households at below-market rents.

The building features a ground-level café, shops, and micro-activations that include a water bottle refill station and a living wall. Resident amenities include a fitness center, lounges, a game room, a golf simulator, and a shared outdoor dining space equipped with a barbecue and firepit. A sky deck on the tower’s roof provides another space for residents to take in views of Oracle Park, San Francisco Bay, and the city’s skyline.

“We wanted to create spaces where residents could connect with each other while feeling embraced by the natural beauty of San Francisco,” said Studio Gang’s founding partner Jeanne Gang. “The tower’s floorplates are carved back at the corners to create outdoor terraces that are unique across each floor. These terraces are oriented to maximize sunlight and protect from the wind while providing residents views of the city and San Francisco Bay. From the street, the alternating carved terraces give the building a rhythmic play of light.”

Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 

Located near major public transit nodes, the site offers access to the waterfront Bay Trail and over 250 bicycle parking spaces to encourage alternative and active modes of transportation. The development is elevated five feet above sea level to ensure protection against future sea level rise and storm surges. The building reuses and recycles greywater for irrigation and non-potable needs, as well as sources hot and cold water from a District Energy Plant. Planted with regionally appropriate flora, the sky deck attracts birds, butterflies, and other pollinators to enhance urban biodiversity. The building is targeting LEED Gold certification.

Verde is part of Mission Rock redevelopment led by Mission Rock Partners, a public-private partnership between Tishman Speyer, the San Francisco Giants, and the Port of San Francisco. The new neighborhood offers unprecedented public access to San Francisco Bay and introduces more than 500 new homes and 600,000 sf of retail and office space to San Francisco’s Central Waterfront.

The first phase of Mission Rock features China Basin Park, a new 5-acre public park designed by SCAPE that opened in April 2024, and four new buildings. In addition to Verde, phase one’s buildings include The Canyon, a residential building designed by MVRDV that opened in June 2023, the new home of Visa’s Market Support Center designed by Henning Larsen that opened in June 2024, and a new commercial building designed by WorkAC.

On the project team:
Owner and/or developer: Mission Rock Partners
Design architect: Studio Gang
Architect of record: Studio Gang
Mechanical Engineer: Critchfield Mechanical Inc.
Electrical Engineer: PAE
Plumbing Engineer: SJE Engineers
Structural engineer: Magnusson Klemencic Associates
General contractor: Webcor Builders

Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, courtesy Studio Gang
Courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, courtesy Studio Gang
Courtesy Studio Gang 

 

Related Stories

Mixed-Use | Mar 21, 2017

Studio Gang commissioned to design its first Canadian building

The project will be a mixed-use tower at the southwest corner of Yonge and Delisle in Toronto.

Retail Centers | Mar 9, 2017

When everyone shops online, what happens to mixed-use retail?

NBBJ’s David Yuan explains how changing retail trends are creating new opportunities for urban experiences and public space. 

High-rise Construction | Mar 3, 2017

Detroit's tallest tower to rise at site of former J.L Hudson's Department Store

SHoP Architects and Hamilton Anderson Associates will design the 52-story building.

Mixed-Use | Mar 1, 2017

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

The ground-up development will feature 255 hotel rooms and 69 residential units.

Mixed-Use | Feb 27, 2017

Tallest tower in Miami to begin construction in January 2019

The tower will reach a height of 1,049 feet, the maximum height permitted by the FAA in Miami.

Mixed-Use | Feb 23, 2017

5-tower scheme revealed for Zhengzhou, China

The towers will vary in height and emerge from a shared retail podium.

Mixed-Use | Feb 22, 2017

Hunt Development Group selected to spearhead Cabrini-Green redevelopment

The Chicago Housing Authority selected the firm to develop mixed-income housing and retail space where the infamous housing project once stood.

Mixed-Use | Feb 21, 2017

Coconut Grove’s newest mixed-use development springs from a converted parking garage

Terra says the development will be the first newly built office building in central Coconut Grove in over 20 years.

High-rise Construction | Feb 17, 2017

Zaha Hadid Architects-designed building to have the world’s tallest atrium

A 190-meter atrium will rise the full height of the building between two twisting sections.

Mixed-Use | Feb 8, 2017

Santiago Calatrava’s first major UK project will be the heart of the Greenwich Peninsula transformation

Peninsula Place will cost £1 billion and act as a gateway to the new, master-planned district.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021