flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The new Olympic House in Switzerland will reflect the international governing body’s values

Cultural Facilities

The new Olympic House in Switzerland will reflect the international governing body’s values

The building, nestled in a large park, is striving to meet three different sustainability standards.


By John Caulfield, Senior Editor | March 25, 2019

The 236,800-sf Olympic House will bring the International Olympic Committee's administration under one roof. Image: 3XN

On June 23, the International Olympic Committee (IOC) will inaugurate Olympic House, its new headquarters building in Lausanne, Switzerland, whose construction is nearing completion.

The building will allow the IOC to consolidate its staff of more than 500 people, who are currently scattered across several buildings in Lausanne. The design of the new building—by the architectural firms 3NX and IttenBrechbühl—reflects the Committee’s values and mission, according to Thomas Bach, IOC’s president.

Last week, Bach and Kim Herforth Nielsen, 3XN’s cofounder and Principal, presented a preview of Olympic House to the business press at The Plaza Hotel in New York.

The 145 million Swiss Franc (US$146 million) building, with 22,000 sm (236,806 sf) of usable space, will be located within Louis Bourget Park, one of Lausanne’s largest. Part of the park has been incorporated into the building’s design, whose key objectives correspond with the Olympics’ principles of movement, transparency, flexibility, sustainability, and collaboration.

Olympic House is situated within one of Lausanne's largest parks. Image: 3XN

 

“It’s important to have a story when designing a building,” said Nielsen of Copenhagen-based 3XN, whose design for Olympic House was selected by the IOC Executive Board from 114 entries.

For example, the top of Olympic House is shaped, symbolically, like a dove, representing peace. And in the building’s basement will be a sculpture of an olive tree.

The building façade’s undulating flow pays tribute to athletic movement. The building’s interior—which is supported by only four service cores and 14 pillars—speaks to its structural flexibility. Olympic House is also striving to meet international sustainability standards established by LEED, Minergie (the Swiss energy standard), and SNBS (the Swiss sustainable building standard).

A pumping station will draw water from nearby Lake Geneva to cool and heat the building. Solar panels on the roof will generate 10% of the building’s electricity use, equivalent to the consumption of 60 Swiss households. Olympic House’s shape optimizes daylight coming into the building. The facility will also collect rainwater to recycle for plant irrigation and toilet flushing. (The building’s water consumption is expected to by 60% of a comparable office building.)

A steel-and-wood-clad circular staircase is designed to suggest the five Olympic rings. Image: 3XN

 

One of the more striking design features of Olympic House is its steel-and-wood-clad Unity Staircase, which soars the full height of the building. Intended to reference the five Olympic rings, the staircase will unify the building’s floors. It is being presented as a visual expression of collaboration between IOC and its stakeholders. (Worldwide, there are 206 national Olympic committees.)

IOC is also collaborating with three worldwide Olympic partners: Dow, which is helping the Committee achieve its carbon neutrality goals; Toyota, which is developing a pilot program to install hydrogen stations in Switzerland for vehicles powered by fuel cells; and Panasonic, which is supplying A/V equipment for Olympic House’s meeting rooms.

IOC’s investment in this project includes the renovation of Le Château de Vidy, an 18th Century castle located within Olympic House’s public space.

Founded in Paris in 1894, IOC has undergone several significant reforms under the leadership of the 65-year-old Bach, a German lawyer and Olympic gold medalist in fencing, who became the Committee’s ninth president in September 2013. These reforms include a commitment to publishing an annual financial report, strengthening the role of its Ethics Committee, and auditing national committees that receive money from IOC. The organization is committed to redistributing 90% of its annual revenue to athletes from developing countries.

 

Related Stories

Cultural Facilities | Apr 12, 2016

Studio Libeskind designs angular Kurdish museum rich with symbolism

The museum consists of four geometric volumes separated by somber and uplifting divisions.

Performing Arts Centers | Apr 1, 2016

Adrian Smith + Gordon Gill Architecture’s The Yard at Chicago Shakespeare to begin construction this spring at Navy Pier

Among the unique design features is a movable set of structural audience “towers” that allows for directors and designers to create a space that works best for their specific performances.

Sports and Recreational Facilities | Mar 31, 2016

An extreme sports tower for climbing and BASE jumping is proposed for Dubai’s waterfront

The design incorporates Everest-like base camps for different skill levels.

Cultural Facilities | Mar 21, 2016

PAB Architects designs marketplace to centralize Senegal street vending

The Senegal City Market project consists of groups of store modules and is expected to expand to 13 cities.

Cultural Facilities | Mar 15, 2016

OMA’s first UAE project transforms warehouses into multi-purpose art district venue

Moveable walls will provide different spatial configurations for events and gatherings, and large glass doors will blur indoors and outdoors.

Cultural Facilities | Mar 8, 2016

The sexy side of universal design

What would it look like if achieving universal accessibility was an inspiring point of departure for a project's design process? Sasaki's Gina Ford focuses on Marina Plaza and the Cove, two key features of her firm's Chicago Riverwalk development.

Museums | Mar 3, 2016

How museums engage visitors in a digital age

Digital technologies are opening up new dimensions of the museum experience and turning passive audiences into active content generators, as Gensler's Marina Bianchi examines.

Cultural Facilities | Mar 1, 2016

China bans ‘weird’ public architecture, gated communities

Directs designers of public buildings to focus on functionality.  

Contractors | Feb 25, 2016

Huntsville’s Botanical Garden starts work on new Guest Welcome Center

The 30,000-sf facility will feature three rental spaces of varying sizes.

The High Line | Feb 24, 2016

The last unused portion of the High Line is set to become a piazza

The piazza replaces an earlier design for the space that called for a bowl-shaped garden.

boombox1
boombox2
native1

More In Category



Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021