flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New San Francisco mixed-use tower billed as most earthquake-resistant building on the West Coast

High-rise Construction

New San Francisco mixed-use tower billed as most earthquake-resistant building on the West Coast

A megabrace is a key seismic component at 181 Fremont, with offices, residences, and retail space.


By John Caulfield, Senior Editor | July 14, 2016

Welding has begun on a 70-story-tall office and residential tower in earthquake prone San Franciso that claims it can resist a 500-year earthquake, and be back in full operation within a month after a catastrophic event. Image: Courtesy of 181 Fremont

The developer of 181 Fremont, a 70-story residential and office tower being built in San Francisco, claims this will be the most earthquake-resistant building on the West Coast when it is completed in the summer of 2017.

Jay Paul Company acquired this development from SKS Investments in 2013, and estimates its cost at $665 million. The Class A building will include 432,000 sf of office space, 67 luxury condos on its top 17 floors, and 3,000 sf of retail space.

The building’s architecture (by Heller Manus), residential interior design (by Orlando Diaz-Azcuy) and engineering (by Arup) revolve around a unique megabrace that, according to the developer, would virtually eliminate structural damage from a significant (i.e., 500-year) earthquake. Jay Paul also believes this design could set new standards for earthquake resilience for urban development.

The resilience-based design focuses on saving lives and minimizing structural damage, property loss, and protection of the building’s MEP systems. The building features a sawtooth curtainwall, passive solar energy, and a water-recycling system. It’s the only residential tower in San Francisco to be pre-certified LEED Platinum.

“The seismic design is consistent with our approach to position 181 Fremont as the preeminent tower in San Francisco in every aspect of design and development,” said Matt Lituchy, CIO of Jay Paul Company.

181 Fremont’s calling card is its claim that a seismic event wouldn’t disrupt the building’s business continuity. Occupants and businesses would be able to return to the tower with complete access to business operations, and the building would be fully functional again, within one month. The elevator systems are also designed for continuous operation during a catastrophic event, with contingencies for emergency evacuations.

The tower is adjacent to the new Transbay Transit Center.

Related Stories

High-rise Construction | Jan 4, 2016

Top tall building predictions for 2016

Jetpack-based firefighting, pixelated towers, and high-rise rentals are among the innovations and themes coming to the tall buildings market in 2016, according to the Council on Tall Buildings and Urban Habitat.

High-rise Construction | Jan 4, 2016

Amid high-rise office building boom, Boston grapples with corporate signage rules

City has few skyscrapers adorned with lit company names, logos.  

High-rise Construction | Dec 18, 2015

Architect Mark Foster Gage proposes wildly ornate Gothic skyscraper for NYC

The 102-story tower, 41 West 57th Street, will have glass walls, balconies, and a carved stone façade.

High-rise Construction | Dec 8, 2015

Architect Eric Parry unveils design for London’s tallest building

At more than 1,000 feet, 1 Undershaft will rival The Shard in height.

High-rise Construction | Dec 8, 2015

Saudi Arabia secures funding for world’s first kilometer-tall skyscraper: Jeddah Tower

The tower will overtake the Burj Khalifa in terms of height, but how long will it remain king?  

High-rise Construction | Nov 28, 2015

Anorexic skyscrapers keep popping up in Manhattan

One project slated to begin construction next spring is designed to be only 47 feet wide.

High-rise Construction | Nov 23, 2015

London approves designs for a 62-story tower

Scheduled to start construction next year and open in 2019, the structure will be London’s second tallest, after the 95-story Shard.

High-rise Construction | Nov 17, 2015

CTBUH awards '2015 Best Tall Building Worldwide' to Bosco Verticale

Designed by Italian architect Stefano Boeri, the building design was applauded for its “extraordinary implementation of vegetation at such scale and height."

High-rise Construction | Nov 12, 2015

SHoP unveils Brooklyn supertall tower design

When completed, the 90-story tower will be the tallest building in the outer boroughs of New York City.

High-rise Construction | Oct 26, 2015

Recent skyscraper boom benefits New York construction industry

CTBUH reports that luxury residential construction, slenderness aspect ratios, and construction in "fringe" areas have all increased.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021