With the launch of the CBRE’s new Benchmark In-building Cellular Signal Mapping services, CBRE Telecom Advisory Services can now test and quantify the indoor network quality of entire properties or an individual unit.
In-building coverage has become a necessity for many commercial real estate leasing customers, with more than 80 percent of data usage now occurring inside buildings. The ability for CBRE Telecom Advisory Services to provide detailed reports and high-level snapshots identifying a property’s current cellular and Wi-Fi coverage and performance is invaluable to owners and lessees. CBRE can now identify problem areas before their customers ever enter a building, define where distributed antenna systems (DAS) or other small cell installations may be needed, and move forward with value-added property marketing strategies.
When individuals have poor in-building network experiences, it impacts their overall view of a property,” says Cris Kimbrough, Managing Director of Telecom Advisory Services for CBRE, in a press release.
CBRE’s employment of Mosaik’s Signal Insights application is a key element of the new service. The application measures and evaluates a customer’s cellular and Wi-Fi network experience from the customer or user perspective.
Not only will this allow building owners to better set their leasing partners’ expectations, but they can improve retention by improving the customer experience. CBRE can now measure indoor and outdoor signal, throughput quality, as well as analyze key performance indicators (KPIs), including signal strength, downlink speed, latency and more.
CBRE is expected to start offering Benchmark In-Building Cellular Signal Mapping to its customers beginning in October 2016.
Related Stories
| Nov 16, 2010
Calculating office building performance? Yep, there’s an app for that
123 Zero build is a free tool for calculating the performance of a market-ready carbon-neutral office building design. The app estimates the discounted payback for constructing a zero emissions office building in any U.S. location, including the investment needed for photovoltaics to offset annual carbon emissions, payback calculations, estimated first costs for a highly energy efficient building, photovoltaic costs, discount rates, and user-specified fuel escalation rates.
| Nov 9, 2010
12 incredible objects being made with 3D printers today
BD+C has reported on how 3D printers are attracting the attention of AEC firms. Now you can see how other creative types are utilizing this fascinating printing technology. Among the printed items: King Tut’s remains, designer shoes, and the world’s smallest Rubik’s Cube.
| Nov 5, 2010
New Millennium’s Gary Heasley on BIM, LEED, and the nonresidential market
Gary Heasley, president of New Millennium Building Systems, Fort Wayne, Ind., and EVP of its parent company, Steel Dynamics, Inc., tells BD+C’s Robert Cassidy about the Steel Joist Manufacturer’s westward expansion, its push to create BIM tools for its products, LEED, and the outlook for the nonresidential construction market.
| Nov 2, 2010
Energy Analysis No Longer a Luxury
Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.