A company in Windsor, Calif. recently announced it has developed a structural wall system that uses a combination of bamboo-based engineered panels and metal to produce wall cavities that eliminate almost all of the studs.
According to residentialproductsonline.com, the system, named the Prime Wall System, incorporates top and bottom metal tracks with panels made from bamboo laminated with plywood veneer. The metal tracks are installed on a concrete slab or wood subfloor and are used to secure the bamboo panels in place.
According to the company, the Prime Wall System will speed framing, reduce waste, save money, and improve the thermal performance of the home. Additionally, an empty wall cavity means the installation of electrical, plumbing, mechanical, and media can be quickly completed since there aren’t any studs to drill through.
The panels are prefabricated and, by the time they reach the build site, a CNC router will have already cut out every door, window, light switch, electrical outlet, and plumbing access. Interior walls that will be painted are pre-sanded to a 180-grit finish, meaning there is no need for drywall, and if stucco, masonry, or a stone finish will be used, BamCore provides the additional wall blocking to decrease the chance of wall or ceiling deflection.
In total, the Prime Wall System manages to eliminate over 95% of floor-to-ceiling wood studs and posts.
Related Stories
| Nov 2, 2010
11 Tips for Breathing New Life into Old Office Spaces
A slowdown in new construction has firms focusing on office reconstruction and interior renovations. Three experts from Hixson Architecture Engineering Interiors offer 11 tips for office renovation success. Tip #1: Check the landscaping.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 12, 2010
Holton Career and Resource Center, Durham, N.C.
27th Annual Reconstruction Awards—Special Recognition. Early in the current decade, violence within the community of Northeast Central Durham, N.C., escalated to the point where school safety officers at Holton Junior High School feared for their own safety. The school eventually closed and the property sat vacant for five years.
| Oct 12, 2010
Guardian Building, Detroit, Mich.
27th Annual Reconstruction Awards—Special Recognition. The relocation and consolidation of hundreds of employees from seven departments of Wayne County, Mich., into the historic Guardian Building in downtown Detroit is a refreshing tale of smart government planning and clever financial management that will benefit taxpayers in the economically distressed region for years to come.
| Oct 12, 2010
Owen Hall, Michigan State University, East Lansing, Mich.
27th Annual Reconstruction Awards—Silver Award. Officials at Michigan State University’s East Lansing Campus were concerned that Owen Hall, a mid-20th-century residence facility, was no longer attracting much interest from its target audience, graduate and international students.
| Sep 13, 2010
Second Time Around
A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.
| Aug 11, 2010
Using physical mockups to identify curtain wall design flaws
Part two of a five-part series on diagnosing and avoiding cladding, glazing, and roofing failures from building forensics expert IBA Consultants.