The modernization project at the Newark Liberty International Airport is officially underway. The Port Authority of New York and New Jersey has recently broken ground on the $2.4 billion project.
The largest aspect of the project is the redevelopment of the original Terminal A building, which opened in 1973 and is being replaced with a new 1 million-sf terminal building. PGAL is the lead architect responsible for advanced planning and concept development for the structure.
Included in the new terminal are 33 domestic aircraft gates, expanded departures and arrivals curbside frontage, a parking garage complex, and infrastructure improvements. The terminal is designed to initially accommodate up to 13.6 million passengers each year, but is incorporating the flexibility necessary to expand to serve larger aircraft and increased passenger demand in the future.
Rendering courtesy PGAL.
An expandable security screening checkpoint will provide increased passenger queue space and dedicated lanes for premium passengers, crew, and physically challenged travelers. A new baggage claim area will include six claim units with immediate access to airline services offices and passenger amenities for two defined arrivals areas from the departures concourses. Hold room seating areas will comprise a broad range of retail and food and beverage options and airline lounges are immediately accessible after the security checkpoint.
Additionally, a new departures and arrivals roadway system will support Terminal A. The new 3,000-car parking garage complex will feature a pedestrian bridge and hub connection that links passengers from the garage and Air Train to the terminal.
Rendering courtesy PGAL.
The new Terminal A is expected to be fully operational in 2022.
Related Stories
Airports | Feb 10, 2019
Chicago searches for the right design to expand O’Hare Airport and make passenger connections less stressful
Competition finalists took different approaches to rethinking the logistics of a gigantic, hectic space.
Airports | Oct 31, 2018
Foster + Partners’ Mexico City Airport has been cancelled
The project was set to cost $13.3 billion.
Airports | Aug 3, 2018
Airport trends 2018: Full flights with no end in sight
As service demand surges, airports turn to technology, faster building techniques.
Airports | May 31, 2018
Denver's airport city
Cultivation of airport cities is an emerging development strategy shaped by urban planners, civic leaders, airport executives, and academics.
| May 24, 2018
Accelerate Live! talk: Security and the built environment: Insights from an embassy designer
In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.
Retail Centers | Apr 19, 2018
Miami International Airport is home to the first Johnnie Walker store in the U.S.
The store will be a permanent fixture in the airport’s North Terminal.
Airports | Feb 21, 2018
Terminal Modernization: Why Bother? Part II
This is the second post in our series examining why airport operators should bother to upgrade their facilities, even if capacity isn’t forcing the issue.
Airports | Feb 7, 2018
LaGuardia Airport receives eight private work booths in Terminal B
The hub sees over 15 million travelers annually.
Libraries | Jan 29, 2018
Commercial plane that skidded off the runway may become Turkey’s newest public library
The plane was removed from its cliffside perch five days after the incident.
Giants 400 | Oct 5, 2017
On wings of gold: Alternative financing schemes are propelling the high-flyin’ air terminals sector
The $4 billion renovation of New York City’s LaGuardia Airport is the first major U.S. aviation project delivered using a public-private partnership (P3) model.