flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

News Briefs: Design firms say they need more project management training...  Jones named director of GSA's Design Excellence program... Carbon prices running out of gas in Northeast cap and trade market

News Briefs: Design firms say they need more project management training...  Jones named director of GSA's Design Excellence program... Carbon prices running out of gas in Northeast cap and trade market


August 11, 2010
This article first appeared in the 200908 issue of BD+C.

Design firms say they need more project management training. Nearly one-third (32%) of design and environmental firms report that project management training is their biggest training need, according to a survey in The Zweig HR Letter. Next in importance: marketing and business development training (19%) and leadership training (16%).Carbon prices running out of gas in Northeast cap and trade market. The price of carbon permits plummeted 8% for the Regional Greenhouse Gas Initiative (RGGI), which requires utilities in the Northeast to purchase carbon permits for each ton of carbon they emit. Lower demand for electricity as a result of the recession was the cause of the price plummet. More than 30 million permits (or allowances) had cleared at $3.23 each in a sale on June 17, 8% lower than the auction price in March.First green roof professionals certified. Green Roofs for Healthy Cities announced the first wave of accredited green roof professionals. These individuals have successfully completed a multidisciplinary exam encompassing five areas of concentration, including pre-design, design, contract management, quality assurance and support, and maintenance.Jones named director of GSA's Design Excellence program. Casey Jones, a principal at jones¦kroloff, has been named the next director of the General Services Administration's Design Excellence program, according to sources at the GSA. Jones will replace Thomas Grooms, the program's current head. As director of Design Excellence, Jones will oversee the architect selection and design process for the GSA.

Related Stories

Office Buildings | Jul 17, 2018

Transwestern report: Office buildings near transit earn 65% higher lease rates

Analysis of 15 major metros shows the average rent in central business districts was $43.48/sf for transit-accessible buildings versus $26.01/sf for car-dependent buildings.

Architects | Jul 10, 2018

AEC marketing fundamentals can still have a role in winning new business

In our Internet-fueled world, it’s easy to get distracted by the latest online tools. But the boring stuff is still important, and you don’t want to lose sight of old-school techniques that are just as persuasive now as they were a few decades ago.

Adaptive Reuse | Jul 9, 2018

Work, park, live: Inside Cincinnati’s parking garage turned lifestyle hotel

The Summit hotel and conference center is a converted parking garage that was once a factory.

Architects | Jun 28, 2018

Designing successful maker spaces

The challenge is to design makerspaces that work, spaces that function as a tool for educators to produce better students.

Architects | Jun 27, 2018

Steven A. Lichtenberger joins Leo A Daly as President

He will lead the firm’s global planning, architecture, engineering, and interiors practice worldwide.

Accelerate Live! | Jun 24, 2018

Watch all 19 Accelerate Live! talks on demand

BD+C’s second annual Accelerate Live! AEC innovation conference (May 10, 2018, Chicago) featured talks on AI for construction scheduling, regenerative design, the micro-buildings movement, post-occupancy evaluation, predictive visual data analytics, digital fabrication, and more. Take in all 19 talks on demand.

Building Team | Jun 22, 2018

What owners should know before choosing the design-build project delivery method

Outside of drawing up a well-written contract, owners often overlook a key attribute that can significantly impact the success of a design-build project, writes Skanska’s Julie Hyson.

Architects | Jun 14, 2018

Chicago Architecture Center sets Aug. 31 as opening date

The Center is located at 111 E. Wacker Drive.

Multifamily Housing | Jun 13, 2018

Multifamily visionaries: KTGY’s extraordinary expectations

KTGY Architecture + Planning keeps pushing the boundaries of multifamily housing design in the U.S., Asia, and the Middle East.

| Jun 11, 2018

Accelerate Live! talk: Regenerative design — When sustainability is not enough

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), HMC’s Eric Carbonnier poses the question: What if buildings could actually rejuvenate ecosystems?

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021