flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nexii builds the first sustainably constructed Popeyes restaurant in Canada

Sustainability

Nexii builds the first sustainably constructed Popeyes restaurant in Canada

The new restaurant was built in under two weeks.


By David Malone, Associate Editor | May 28, 2021

Courtesy Nexii

Nexii Building Solutions, which recently completed a first-of-its-kind Starbucks in Abbotsford, B.C., has now completed the first sustainably constructed Popeyes restaurant in Canada.

Also located in Abbotsford, the new restaurant was built in under two weeks. Nexii’s high-performanve green building products are precision manufactured in plants to project specifications using 3D software. This process means the Nexii panels are able to fit together like jigsaw pieces onsite, accelerating standard build times by between 50% and 75%. The process also enables Nexii to eliminate almost all onsite construction waste.

Nexiite, Nexii’s proprietary material used within its building panels, is more thermally efficient and less carbon-intensive than concrete. When assembled, the Nexii panels create an airtight building envelope. Nexii estimates the Popeyes restaurant’s operational building carbon emissions will be reduced by approximately 30%.

The Popeyes restaurant is expected to open to the public by the fall of 2021.

Related Stories

Green | Apr 13, 2018

evolv1 earns Canada’s first Zero Carbon Building-Design certification

The multi-tenant commercial office building is currently under construction.

Sustainability | Apr 11, 2018

Hampshire College is home to the largest Living Certified higher education project in the world

The project joins 16 other Living Buildings certified to date.

Sustainability | Apr 10, 2018

Thermal comfort, big impact

CallisonRTKL’s Pablo La Roche explains how outdoor thermal comfort could mitigate the effects of climate change.

Sustainability | Apr 9, 2018

Planning for 100: Looking beyond the horizon of zero-net-energy buildings

Imagine a future where buildings and infrastructure are 100% utilized and 100% responsive.

Sustainability | Mar 21, 2018

LEED v4.1 — a game changer or business as usual?

The largest number of changes in v4.1 affect materials.

Energy-Efficient Design | Mar 20, 2018

University of Hawaii Maui College on pace to become first U.S. campus to generate 100% renewable energy on-site

The project is part of a partnership with Johnson Controls and Pacific Current that will also allow four UH community college campuses on Oahu to significantly reduce their fossil fuel consumption.

Adaptive Reuse | Mar 8, 2018

LEED Platinum for Memphis industrial reuse project

Memphis-based engineering firm OGCB and contractor Grinder Tabor Grinder led the removal of 54 million lb of concrete and 10 million lb of metal.

Hotel Facilities | Feb 12, 2018

Circular hotel will be world’s first energy positive hotel concept above the Arctic Circle

The hotel will provide 360-degree views of the Svartisen glacier and the surrounding arctic nature.

Wood | Feb 5, 2018

The largest timber office building in the U.S. will anchor Newark, N.J. mixed-use development

Michael Green Architecture is designing the building.

boombox1
boombox2
native1

More In Category


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021