flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

N.J. middle school puts its small site to use

Education Facilities

N.J. middle school puts its small site to use

The school is named in honor of Martin Luther King, Jr.’s vision of the “Beloved Community.”


By David Malone, Associate Editor | January 21, 2019
Rendering of BelovED Middle School

Courtesy Urbahn Architects

The BelovED Community Charter School’s Middle School building recently had its topping out celebration at its half-acre parcel of land located at 535 Grand Street in Jersey City, N.J.  

The 53,000-sf building will make use of its small site and include 18 general classrooms and a variety common spaces for both students and staff. Outside the building, a parking lot with space for 29 cars and outdoor assembly/recreation space will also be included.

The building’s ground floor will include the parking lot and an entrance lobby with an elevator and a security desk. A loading dock with a 20-foot-wide overhead coiling gate will also be included on the ground floor. The second floor will cantilever over the parking lot and house a 3,600-sf cafetorium and kitchen, an office suite, a nurse’s office, classrooms, and two sets of double stairs in addition to the elevator. The third floor will include additional classrooms, a 750-sf multi-purpose room, a gymnasium, an art classroom, locker rooms, and a main distribution frame room. The fourth and final floor will house a 750-sf music room with a stepped stage for rehearsals and performances, more classrooms, a special education classroom, and a teacher’s lounge/break room.

 

BelovED Middle School from the sideCourtesy Urbahn Architects.

 

Due to the site’s low-bearing soil, Hollister Construction Services installed 150 concrete-filled, 100-foot-deep steel piles with pile caps and piers to support the foundation system of concrete grade beams and the building’s structural steel frame with lightweight concrete on galvanized composite metal deck. The building’s façade will feature Exterior Insulation and Finish System (EIFS), a non-load bearing, exterior wall cladding on steel studs, with Batt insulation. Energy efficiency will be also improved by thermally- proficient low emissivity (or low-e) windows with high visible transmittance (VT) properties that will allow increased amounts of natural light into the school’s interiors.

 

See Also: New Life Science Building at University of Washington designed for the next generation of research and teaching

 

The new school building, which will serve grades six to nine, will open in the second half of 2019 as it welcomes its first 360 students.

Related Stories

Architects | Jan 19, 2017

Harley Ellis Devereaux merges with Deems Lewis McKinley

The combination is expected to bolster HED’s presence in northern California and the K-12 sector.

Education Facilities | Jan 17, 2017

A charter school gives adults a second chance at earning a high school diploma

A dingy basement in Washington is converted to an office-like learning environment.

Education Facilities | Jan 10, 2017

Outdoor educational environments provide a campus experience

Interior and exterior spaces harmoniously provide a campus experience to challenge children in the classroom, while also providing opportunities for learning and play outside.

Education Facilities | Dec 14, 2016

Design for NYU’s new $1 billion academic and student housing development revealed

The building has been opposed for years as activists called for the land to become a public park.

Energy Efficiency | Dec 13, 2016

A Massachusetts college now features the largest zero-net-energy academic building in Northeast

Bristol Community College wants to be carbon neutral by 2050.

Education Facilities | Dec 7, 2016

How corporate design keeps educational design relevant

Learning is a lot like working; it varies daily, ranges from individual to collaborative, formal to informal and from hands on to digital.

School Construction | Oct 23, 2016

As construction rebounds, education sector spending flattens

Post-recession slump suggests a settling in at a “normal” level similar to the mid aughts.

Education Facilities | Oct 3, 2016

College prep high school begins campus-wide transformation with 22,000-sf expansion project

The expansion marks the first phase of the two-phase project.

Education Facilities | Sep 14, 2016

POE study: Architecture firm goes back to school to reevaluate its work

HMFH has designed three elementary schools based on the premise that project-based activities promote engagement, critical thinking, creativity, and collaboration.

University Buildings | Sep 12, 2016

The University of Chicago’s newest residence halls are designed to be more like home

Abundant common spaces give students more chances to interact.

boombox1
boombox2
native1

More In Category


University Buildings

Des Moines University Medicine and Health Sciences opens a new 88-acre campus

Des Moines University Medicine and Health Sciences has opened a new campus spanning 88 acres, over three times larger than its previous location. Designed by RDG Planning & Design and built by Turner Construction, the $260 million campus features technology-rich, flexible educational spaces that promote innovative teaching methods, expand research activity, and enhance clinical services. The campus includes four buildings connected with elevated pathways and totaling 382,000 sf. 



Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021