flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

No decline in construction costs in sight

Market Data

No decline in construction costs in sight

Construction cost gains are occurring at a time when nonresidential construction spending was down by 9.5 percent for the 12 months through July 2021.


By John Caulfield, Senior Editor | October 11, 2021
Materials and supplier availability is the main reason why construction projects are getting delayed this year, according to JLL's new forecast on costs. Charts: JLL
A disrupted supply chain is causing construction project delays, and isn't expected to get better any time soon, according to JLL's latest outlook on construction costs. Charts: JLL

Construction costs are expected to increase by around 6 percent in 2021, and grow by another 4 to 7 percent in 2021, according to JLL’s Construction Cost Outlook for the second half of this year.

The Outlook tracks what has been “unprecedented” volatility in materials prices, which for the 12 months through August 2021 soared by 23 percent. Over that same period, labor costs rose by 4.46 percent, bringing total construction costs up by 4.51 percent. “The lack of available labor has led to more project delays so far in 2021 than a lack of materials, and conditions are expected to worsen over the coming year,” states Henry Esposito, JLL’s Construction Research Lead and the Outlook’s author.

Construction cost gains are occurring at a time when nonresidential construction spending was down by 9.5 percent for the 12 months through July 2021. JLL does not expect a “true” rebound in that spending until the Spring or Summer of next year. And don’t count on any immediate jolt from the federal infrastructure bill that, even if it passes, won’t impact construction spending or costs for two to six years out.

Construction recovery also faces two big immediate challenges:

Supply chain delays and record-high cost increases continue to put pressure on project execution and profitability. And the delta variant and future waves of the pandemic have the potential to slow economic growth, weakening the construction rebound “and calling into question some of the rosier predictions for 2022.” The Outlook states.

SHORTAGES AND DELAYS WILL CONTINUE THROUGH ‘22

As demand for new projects continues to grow and contractor backlogs fill, there will be less incentive to bid aggressively, and contractors will aim to pass through cost increases to owners as soon as the market can bear it. This combination of factors leads JLL to extend its forecasts for 4.5 to 7.5 percent final cost growth for nonresidential construction in calendar year 2021 and to predict a similar 4 to 7 percent cost growth range for 2022.

Materials prices are soaring
Materials costs have been skyrocketing this year in almost every building materials category (below).

 

Metal products have been especially vulnerable to price hikes.

Some materials costs will ease, but the average increase will land somewhere between 5 and 11 percent. Aside from costs, the most pressing issues for most construction materials right now are lead times and delays. “Hopes for major relief during 2021 have been largely dashed, with hope for a return to normal now pushed out into 2022,” says JLL. The most pressing development might be the recent coup d’état in Guinea, which is one the world’s largest exporters of bauxite, the ore needed to produce aluminum.

The gap widens between supply and demand for labor.
The gap between supply and demand for construction labor is widening, and causing labor costs to remain high.
 

The industry’s labor shortage isn’t abating, either. From 2015 to 2019, the number of open and unfilled jobs in construction across the country doubled to 300,000. And while construction was one of the fastest sectors to recover from the pandemic, its workforce numbers still fall far short of demand, which is why JLL expects labor costs to grow in the 3 to 6 percent range. Construction also has the lowest vaccination rate, and the highest vaccine hesitancy rate, of any major industry, so jobsite workers remain more vulnerable to airborne infection that might sideline them.

Wage increases vary by market
Wage increases seem to be more uniform across the U.S. for construction labor.

 

JLL shows that high-wage states are clustered in the Northeast corridor and the West Coast. The Midwest is also a high-cost region, with Illinois standing out as the top state, while the entire Southeast is the cheapest area of the country to hire workers. Wage growth across the country, on the other hand, is more evenly distributed, and some of the top states in total wages—such as Illinois, New York, and California—are only in the middle of the distribution pack.

Related Stories

Market Data | Jul 20, 2020

Construction employment rises from May to June in 31 states, slips in 18

Recent data from Procore on jobsite workers’ hours indicates employment may have leveled off.

Market Data | Jul 20, 2020

6 must reads for the AEC industry today: July 20, 2020

Never waste a crisis and robotic parking systems help developers optimize parking amenities.

Market Data | Jul 17, 2020

7 must reads for the AEC industry today: July 17, 2020

Kennedy Middle School's new Administration/Family Center and Tips to make optimal use of salvaged materials.

Market Data | Jul 16, 2020

Final NEPA rule will make it easier to rebuild infrastructure, reinvigorate the economy, and continue protecting the environment

Administration’s final reforms to the federal environmental review process fix problems with prior process, maintain environmental rigor, and accelerate needed infrastructure improvements.

Market Data | Jul 16, 2020

5 must reads for the AEC industry today: July 16, 2020

1928 hotel reimagined as a new resiential and cultural hub and Walgreens plans hundreds of doctor's offices at its stores.

Market Data | Jul 10, 2020

5 must reads for the AEC industry today: July 10, 2020

The world's tallest hybrid timber tower and the Florida Gators have a new $65 million ballpark.

Market Data | Jul 9, 2020

6 must reads for the AEC industry today: July 9, 2020

The world's most sustainable furniture factory and what will construction look like when COVID-19 ends?

Market Data | Jul 8, 2020

North America’s construction output to fall by 6.5% in 2020, says GlobalData

Even though all construction activities have been allowed to continue in most parts of the US and Canada since the start of the COVID-19 pandemic, many projects in the bidding or final planning stages have been delayed or canceled.

Market Data | Jul 8, 2020

5 must reads for the AEC industry today: July 8, 2020

AEMSEN develops concept for sustainable urban living and nonresidential construction has recovered 56% of jobs lost since March.

Market Data | Jul 7, 2020

Nonresidential construction has recovered 56% of jobs lost since March employment report

Nonresidential construction employment added 74,700 jobs on net in June.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021