flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NORR designs the UK’s first satellite launch Space Hub

Airports

NORR designs the UK’s first satellite launch Space Hub

The project will be located in Sutherland, Scotland.


By David Malone, Managing Editor | July 26, 2021

NORR, along with Arup Engineers and erz landscape architects, has designed the UK’s first satellite launch Space Hub in Sutherland, Scotland. The project will see vehicles carrying commercial satellites launched vertically into space for earth observation. NORR is supporting Highlands and Islands Enterprise (HIE) on the venture.

The rural and naturally significant site for the $21.8 million project presents numerous challenges. The flora, fauna, and scenery behind the natural significance of the area have been considered as part of the spaceport’s design and construction.

The project includes a launch operation and control center, a launch site integration facility, a single launch pad, an antenna park, and associated site infrastructure.

 

SEE ALSO: Designing for the final frontier: Space architecture

 

Last year, the Space Hub gained consent from the Highland Council. “Gaining planning approval from the council is a huge step forward for Space Hub Sutherland. The UK’s space ambitions present a wonderful opportunity for the Highlands and Islands,” said David Oxley, Director of Business Growth with HIE, in a release. “A vertical launch spaceport is a key piece of the national jigsaw, along with the design and manufacture of satellites and launch vehicles, that will ensure Scotland can derive maximum economic benefits from this growing and exciting sector.” The first launch from the site could be as early as 2022.

In addition to the vertical launch site in Scotland, NORR is also designing a horizontal launch site at Glasgow Prestwick Airport.

Tags

Related Stories

| Dec 8, 2014

Moshe Safdie wants to reinvent airports with Jewel Changi Airport addition

A new addition to Singapore's Changi Airport, designed by Moshe Safdie, will feature a waterfall and extensive indoor gardens.

| Nov 19, 2014

The evolution of airport design and construction [infographic]

Safety, consumer demand, and the new economics of flight are three of the major factors shaping how airlines and airport officials are approaching the need for upgrades and renovations, writes Skanska USA's MacAdam Glinn.

| Nov 18, 2014

Grimshaw releases newest designs for world’s largest airport

The airport is expected to serve 90 million passengers a year on the opening of the first phase, and more than 150 million annually after project completion in 2018. 

| Nov 14, 2014

JetBlue opens Gensler-designed International Concourse at JFK

The 175,000-sf extension includes the conversion of three existing gates to international swing gates, and the addition of three new international swing gates.

Sponsored | | Nov 12, 2014

Eye-popping façade highlights renovation, addition at Chaffin Junior High School

The new distinctive main entrance accentuates the public face of the school with an aluminum tube “baguette” system. 

| Oct 26, 2014

New York initiates design competition for upgrading LaGuardia, Kennedy airports

New York Gov. Andrew Cuomo said that the state would open design competitions to fix and upgrade New York City’s aging airports. But financing construction is still unsettled.

| Oct 16, 2014

Perkins+Will white paper examines alternatives to flame retardant building materials

The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.

| Oct 12, 2014

AIA 2030 commitment: Five years on, are we any closer to net-zero?

This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030. 

| Sep 24, 2014

Architecture billings see continued strength, led by institutional sector

On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.

| Sep 22, 2014

4 keys to effective post-occupancy evaluations

Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021