flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Novel 'self-climbing' elevator operates during construction of high-rise buildings

Novel 'self-climbing' elevator operates during construction of high-rise buildings

The JumpLift system from KONE uses a mobile machine room that moves upward as the construction progresses, speeding construction of tall towers. 


By KONE | November 3, 2014
Illustration: KONE
Illustration: KONE

Elevator and escalator manufacturer KONE Inc. announced the first North American installation of the company's JumpLift technology. The system is being implemented on the One Bloor project, Great Gulf’s flagship high-rise condominium under construction in Toronto.

KONE JumpLift, which has already been installed in Europe, Asia, the Middle East, China, and Australia, is an advanced, self-climbing elevator that operates during construction in a building’s permanent hoistway. JumpLift uses a mobile machine room that moves upward as the construction progresses. 

The technology can improve safety and efficiency on job sites and can enable buildings to be completed months ahead of traditional construction timelines.

Great Gulf and KONE are collaborating on the project, which will deliver high-end retail and residential units in Toronto’s Bloor-Yorkville area, and is expected to be completed in 2016.

 

 

The KONE JumpLift technology includes the following benefits:

• Less wait time: Operating at speeds up to 800 fpm (4m/s), five times faster than a traditional external hoist used in construction, KONE JumpLift is able to move construction workers to their floors in a faster, safer way.

• Safer transportation: With all transportation activities taking place inside in a dry and windproof shaft, construction workers can safely move throughout the building regardless of weather conditions, allowing building construction to proceed unhindered.

• Construction efficiency: Using the building’s permanent elevator hoistway for construction use, completed floors can be put into action while allowing the installation to continue above.

• Faster delivery: When the building structure is completed, changing over to the permanent elevator is a straightforward matter of installing the final machinery and finishing the material surfaces of the elevator car, landing doors and signalization.

 

 

“Great Gulf always looks for innovation in design and construction. One Bloor, recently recognized by the International Property Awards as the best hi-rise condominium in North America, is one of the most significant buildings being built in Toronto,” said Christopher Wein, President Great Gulf Residential. “The KONE JumpLift provides real value and this elevator technology will help the entire construction project to proceed more efficiently and safely for everyone working on site.”

Related Stories

Building Technology | Feb 21, 2019

Smart buildings take hold: 8 ways smart tech is transforming commercial buildings

The next generation of intelligent buildings offers promise for unseen levels of energy efficiency, optimization, and occupant health and productivity.

Building Technology | Dec 20, 2018

Autodesk is spending $1.15 billion to acquire two construction tech providers

PlanGrid and BuildingConnected are the latest pieces in the company’s quest to digitize the construction industry.

Building Technology | Dec 18, 2018

Data and analytics are becoming essential for EC firms competing to rebuild America’s infrastructure

A new paper from Deloitte Consulting advises companies to revise their strategies with an eye toward leveraging advanced technologies.

3D Printing | Dec 7, 2018

Additive manufacturing heads to the jobsite

Prototype mobile 3D printing shop aims to identify additive manufacturing applications for construction jobsites.

Energy Efficiency | Dec 5, 2018

Harvard debuts HouseZero as a possible response to making existing buildings more efficient

Hundreds of embedded sensors will inform energy use reduction research.

Building Technology | Oct 15, 2018

Construction continues to be vulnerable to cyberattacks

The latest report from eSentire finds a total of 4 million “hostile events” against all sectors during the spring months.

Building Technology | Sep 20, 2018

A new report tracks industry preferences for building documentation tools

More firms are adding scanning and photography to their services.

Sponsored | Market Data | Sep 17, 2018

Construction Contract Issues?

Building Technology | Sep 17, 2018

A future-ready office building for techie workers will soon spring up in New York City

Groundbreaking for the 20-story 14th@Irving is scheduled for early next year.

Building Technology | Sep 13, 2018

McKinsey report assesses where opportunities could lie in construction technology

McKinsey & Co. sees systems integration and talent acquisition as key investment drivers.

boombox1
boombox2
native1

More In Category



Engineers

Navigating battery energy storage augmentation

By implementing an augmentation plan upfront, owners can minimize potential delays and unforeseen costs when augmentation needs to occur, according to Burns & McDonnell energy storage technology manager Joshua Crawford.


3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021