During a recent restoration, Hotel Breakers, a 110-year-old hotel located adjacent to Ohio’s Cedar Point amusement park, was outfitted with almost 500 Nu-Wood brackets.
One of the goals during the hotel’s 2014 and 2015 refurbishment was to create a low maintenance exterior. Because so many brackets were required, and due to the high elevation at which many would be installed, future maintenance would be costly and difficult. Braun & Steidl Architects, the architect for the project, specified the use of custom-made brackets in three sizes from Nu-Wood.
Photo: Courtesy of Nu-Wood.
The Nu-Wood polyurethane brackets will not rot, crack, absorb water, or swell and are moisture-, mold-, insect-, and impact-resistant, all while retaining the desired aesthetic of real wood. The brackets were made in a range of sizes from three feet tall up to more than five feet tall in order to be clearly visible from the ground.
225 brackets were installed along the roofline in phase one of the renovation and an additional 205 brackets were installed in phase two. 65 brackets will be installed to a new addition planned for the hotel later this year.
Related Stories
| Sep 12, 2011
Putting a stamp on USPS's first green roof
The Morgan Building roof totals 150,000-sf. In addition to a vegetated green roof, other roof areas were upgraded and included 55,000-sf of reflective concrete pavers and ballast, which were also placed over a Sarnafil waterproofing membrane, and 40,000-sf of EnergySmart Roof—a reflective, energy-efficient vinyl roofing system from Sika Sarnafil.
| Sep 9, 2011
Kauffman Center for the Performing Arts in Kansas City opens this month
Theatre Projects played the lead role in theatre design and planning as well as in engineering the customized theatre equipment. BNIM in Kansas City served as the executive architect.
| Aug 19, 2011
Enhanced acoustical design
Ambient noise levels in some facility types are trending up and becoming a barrier to clear communication between building occupants.
| Jul 22, 2011
The Right Platform for IPD
Workstations for successful integrated project delivery, a white paper by Dell and BD+C.
| Jul 22, 2011
Air barrier systems: Your guide to optimal performance
Expert advice on how to control wasteful air leakage in the building envelope.