flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Office Report: Fitouts, renovations keep sector moving

Office Report: Fitouts, renovations keep sector moving

BD+C's Giants 300 Top 25 AEC Firms in the Office sector.


By By BD+C Staff | July 20, 2012
Headquarters of 9to5 Seating, Hawthorne, Calif., a manufacturer of ergonomic off
Headquarters of 9to5 Seating, Hawthorne, Calif., a manufacturer of ergonomic office seating. The 100,000-sf office, manufacturin
This article first appeared in the July 2012 issue of BD+C.

Is there life after death? Judging by the commercial office sector, maybe there is. After several years in an advanced stage of morbidity, propped up largely by tenant fitouts and renovations, the office sector may be starting to show signs of life.

The ULI Center for Capital Markets and Real Estate recently stated (based on data from CBRE) that the sector is expected to show “steady and substantial three-year improvements,” with vacancy rates declining from 15.4% this year, to 14.4% in 2013 and 12.3% by year-end 2014.

Rental rates should be up 3.7% in ’13, says the ULI. +

 

TOP 25 OFFICE SECTOR ARCHITECTURE FIRMS

Rank Company 2011 Office Revenue ($)
1 Gensler 432,000,000
2 HOK 144,865,720
3 Perkins+Will 103,737,646
4 HDR Architecture 40,800,000
5 Kohn Pedersen Fox Associates 40,030,000
6 Hammel, Green and Abrahamson 39,600,000
7 NBBJ 38,830,000
8 RTKL Associates 38,055,565
9 Nelson 36,223,716
10 SmithGroupJJR 30,700,000
11 Heery International 29,004,000
12 PageSoutherlandPage 28,130,000
13 HLW International 26,750,000
14 HNTB Architecture 25,231,479
15 Cannon Design 23,000,000
16 IBI Group 22,391,853
17 EYP Architecture & Engineering 20,000,000
18 Little 19,739,500
19 LEO A DALY 16,832,770
20 Ware Malcomb 16,762,000
21 DLR Group 14,000,000
22 ZGF Architects 13,227,504
23 RSP Architects 13,151,000
24 HKS 12,227,874
25 Corgan Associates 12,109,000

 

TOP 25 OFFICE SECTOR ENGINEERING FIRMS

Rank Company 2011 Office Revenue ($)
1 AECOM Technology  Corp. 1,291,000,000
2 Jacobs 261,100,000
3 Parsons Brinckerhoff 127,900,000
4 Science Applications International Corp. 116,240,000
5 URS Corp. 58,000,000
6 Burns & McDonnell 43,493,660
7 Michael Baker Jr., Inc. 42,890,000
8 Stantec 42,300,000
9 Dewberry 41,215,530
10 Thornton Tomasetti 34,780,000
11 WSP USA 34,500,000
12 ESD/Environmental Systems Design 22,900,000
13 Arup 19,146,849
14 Syska Hennessy Group 18,504,074
15 AKF Group 15,500,000
16 Sebesta Blomberg 14,590,000
17 GHT Limited 13,891,000
18 Clark Nexsen 13,029,482
19 Glumac 11,736,618
20 KPFF Consulting Engineers 10,000,000
21 R.G. Vanderweil Engineers 9,354,500
22 Wiss, Janney, Elstner Associates 8,967,000
23 RDK Engineers 8,835,000
24 H&A Architects & Engineers 7,757,000
25 Interface Engineering 7,290,488

 

TOP 25 OFFICE SECTOR CONSTRUCTION FIRMS

Rank Company 2011 Office Revenue ($)
1 Turner Corporation, The 1,489,944,482
2 Clark Group 1,148,992,603
3 Structure Tone 1,004,320,000
4 Balfour Beatty US 825,948,471
5 Hensel Phelps Construction 619,660,000
6 Gilbane Building Co. 617,058,000
7 PCL Construction Enterprises 594,444,509
8 BL Harbert International 589,000,000
9 James G. Davis Construction Corp. 450,000,000
10 Clayco 426,000,000
11 Suffolk Construction 388,644,645
12 Whiting-Turner Contracting Co., The 386,520,693
13 Holder Construction 327,000,000
14 Tutor Perini Corp. 312,940,000
15 Weitz Company, The 302,418,397
16 Ryan Companies US 288,463,756
17 DPR Construction 261,922,722
18 Jacobs 261,100,000
19 Webcor Builders 229,121,806
20 Mortenson 221,980,000
21 Walsh Group, The 211,738,006
22 JE Dunn Construction 203,050,158
23 Pepper Construction Group 197,357,000
24 Jones Lang LaSalle 180,000,000
25 Lend Lease 173,228,092

Related Stories

| Nov 10, 2011

Skanska Moss to expand and renovate Greenville-Spartanburg International Airport

The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.

| Nov 10, 2011

Suffolk Construction awarded MBTA transit facility and streetscape project

The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard

| Nov 10, 2011

Thornton Tomasetti’s Joseph and Choi to co-chair the Council on Tall Buildings and Urban Habitat’s Outrigger Design Working Group

Design guide will describe in detail the application of outriggers within the lateral load resisting systems of tall buildings, effects on building behavior and recommendations for design. 

| Nov 9, 2011

Lincoln Center Pavilion wins national architecture and engineering award

The project team members include owner Lincoln Center for the Performing Arts, New York; design architect and interior designer of the restaurant, Diller Scofidio + Renfro, New York; executive architect, FXFOWLE, New York; and architect and interior designer of the film center, Rockwell Group, New York; structural engineer Arup (AISC Member), New York; and general contractor Turner Construction Company (AISC Member), New York. 

| Nov 9, 2011

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers

Program leads the industry in recovering and recycling roofing membrane into new roofing products.

| Nov 9, 2011

American Standard Brands joins the Hospitality Sustainable Purchasing Consortium

  American Standard will collaborate with other organizations to build an industry-wide sustainability performance index.

| Nov 8, 2011

Transforming a landmark coastal resort

Originally built in 1973, the building had received several alterations over the years but the progressive deterioration caused by the harsh salt water environment had never been addressed.

| Nov 8, 2011

WEB EXCLUSIVE: Moisture-related failures in agglomerated floor tiles

Agglomerated tiles offer an appealing appearance similar to natural stone at a lower cost. To achieve successful installations, manufacturers should provide design data for moisture-related dimensional changes, specifiers should require in-situ moisture testing similar to those used for other flooring materials, and the industry should develop standards for fabrication and installation of agglomerated tiles.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021