flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

One of Europe’s largest office and warehouse buildings is made entirely of wood

Wood

One of Europe’s largest office and warehouse buildings is made entirely of wood

Exli designed and built the project.


By David Malone, Associate Editor | June 24, 2020

All photos courtesy Exli.

A new office and warehouse building on the outskirts of Gothenburg, Sweden, made entirely of wood, has completed construction.

The building offers 18,836 sf of space for Sjöklint Agenturer – a Nordic fashion agency. Early in the design process Exli and Sjöklint Agenturer decided to use wood for the building to creating a striking aesthetic as well as to embody the drive for environmentally-friendly architecture and design in Europe. Kebony wood was used for the exterior facades.

 

Exterior kebony facade in Gothenburg, Sweden

 

Kebony uses an environmentally friendly process that modifies sustainably sourced softwoods by heating the wood with furfural alcohol. By polymerizing the wood’s cell wall, the softwoods permanently take on the attributes of tropical hardwood, including high durability, hardness, and dimensional stability.

“Constructing one of Europe’s largest office and warehouse buildings in solid wood has required commitment and innovation, and the results are utterly unique,” said Johann Johannson, a contractor with Exli.

Tags

Related Stories

| Aug 11, 2010

Great Solutions: Products

14. Mod Pod A Nod to Flex Biz Designed by the British firm Tate + Hindle, the OfficePOD is a flexible office space that can be installed, well, just about anywhere, indoors or out. The self-contained modular units measure about seven feet square and are designed to serve as dedicated space for employees who work from home or other remote locations.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021