flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Patient care with clarity: UCSD Jacobs Medical Center strikes new form in health care delivery

Sponsored Content Glass and Glazing

Patient care with clarity: UCSD Jacobs Medical Center strikes new form in health care delivery

A 'patient first' approach was the inspiration for the hospital’s design.


By Vitro | October 23, 2018

A new version of health care is being delivered at Jacobs Medical Center, a gleaming 509,000-square-foot, 245-bed medical and surgical specialty hospital in the University of California San Diego Health System. There, patients are in control: They can securely review their treatment schedules on tablet computers, adjust the room temperature and lighting, or adjust their “smart” bed to get a better view of the surrounding hills and ocean.

This “patient first” approach was the inspiration for the hospital’s design. With an objective to establish a healing, relaxing environment, architectural firm CannonDesign specified transparent solar control low-emissivity (low-e) Solarban® 70XL glass on Starphire Ultra-Clear® glass by Vitro Glass to provide abundant natural daylight and minimize glare and outside noise.

Although it met performance requirements, the glass specification had to be adjusted to achieve another design objective. That required close collaboration between Vitro Glass and Northwestern Industries, Inc. (NWI), a Vitro Certified™ fabricator.

“The architect wanted the building to have a whitish exterior look,” explained Frank Forgione of NWI. “We worked with Vitro testing various glass samples and mock-ups that could meet this requirement and still maintain the desired performance. Ultimately, we put a customized silk-screened white frit on Starphire Ultra-Clear® glass, which we laminated on Solarban® 70XL glass.”

This configuration was used extensively, including the floor-to-ceiling windows in all patient rooms; the front-glazed, unitized curtain wall system; and spandrel shadow-box glazing. More than 100,000 square-feet of glass was installed.

To handle this high volume and facilitate the timely shipment of glass orders to ENCLOS, the glazing contractor, NWI used the Vitro Concierge Program™, which provides logistics management and customized coordination for large projects. By providing priority access to the glass, the Vitro Concierge Program™ helped to ensure the project stayed on schedule. “We worked closely with ENCLOS to meet their scheduling requirements, and worked through the Concierge Program, which allowed us to stay on top of everything,” said Forgione.

Other amenities were incorporated to ensure convenience and comfort. Patient rooms were designed as private suites furnished with smart beds oriented for panoramic views of La Jolla and equipped with tablet computers that patients can use to see their treatment schedules and medical records and control motorized solarshading, lighting and temperature.

Since starting operation in November 2016, Jacobs Medical Center has passed its check-ups with flying colors. Groundbreaking research and education, advanced surgical technologies and a patient-first ethos in an architecturally significant setting have ushered in a new era of health care.

Formulated with the industry’s most advanced triple-silver coating, Solarban® 70XL glass has visible light transmittance (VLT) of 64 percent with a solar heat gain coefficient (SHGC) of 0.27 and a light-to-solar gain (LSG) ratio of 1.85. This high performance, combined with the silk-screened white frit on Starphire Ultra-Clear® glass, helped achieve design objectives and enabled the facility to earn LEED® (Leadership in Energy and Environmental Design) certification at the Silver level.

To learn more about Solarban® 70XL glass or Starphire Ultra-Clear® glass by Vitro Architectural Glass, visit www.vitroglazings.com.

Related Stories

| Apr 27, 2012

China Mobile selects Leo A Daly to design three buildings at its new HQ

LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.

| Apr 24, 2012

AECOM design and engineering team realizes NASA vision for Sustainability Base

LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.

| Apr 5, 2012

5 tips for a successful door and window retrofit

An exclusive tip sheet to help the Building Team manage door and window retrofits successfully.

| Apr 4, 2012

Bald joins the Harmon glazing team

Bald has 13 years of experience in the glazing industry, coming to Harmon from Trainor where he was the regional manager of the Mid-Atlantic region.

| Apr 3, 2012

Blaine Brownell on innovative materials applications in architecture

Brownell, who was named a BD+C 40 Under 40 in 2006, provides insight regarding emerging material trends and the creative implementation of materials.

| Apr 3, 2012

AGC Glass to reopen shuttered plant

Shuttered since 2008, the plant produces clear and tinted float glass serving architectural glass markets.

| Apr 2, 2012

TGP launches new fire-rated glazing website

Website offers online continuing education courses registered with the American Institute of Architects (AIA), BIM 3D models, and rapid-response quoting, among other support tools.

| Mar 29, 2012

Roller shade operating system wins IF Product Design Award

Design experts in the iF jury recognized the engineering invested in the RB 500 Roller Shade, including a metal clutch with a patented construction, a durable zamac housing with polished finish, and a chain drive unit that excels in maximum operating comfort.

| Mar 16, 2012

Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge

Architects in U.S. and abroad offered the chance to showcase their very best work.

| Mar 13, 2012

Commercial glazer Harmon expanding into Texas

Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.

boombox1
boombox2
native1

More In Category



Glass and Glazing

The next generation of thermal glazing: How improving U-value can yield energy savings and reduce carbon emissions

The standards for energy-efficient construction and design have been raised. Due to the development of advanced low-e coatings for the interior surface and vacuum insulating technologies, architects now have more choices to improve U-values wherever enhanced thermal performance is needed to create eco-friendly spaces. These options can double or even triple thermal performance, resulting in annual energy savings and a positive return on carbon.


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021