flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Peddle Thorp Architects' solar-powered Melbourne high-rise looks to go off the grid

High-rise Construction

Peddle Thorp Architects' solar-powered Melbourne high-rise looks to go off the grid

The skyscraper would be the first in Australia to incorporate solar cells in its façade.


By David Malone, Associate Editor | September 6, 2016

While many cities around the United States and around the world are beginning to impose rules and regulations for newly constructed buildings in terms of incorporating solar power systems and panels on the roof, a proposed building in Melbourne is taking things a step further. Sol Invictus Tower, a proposed 60-story, 520-unit residential skyscraper would include solar cells in its façade and store the captured energy in Tesla-like batteries, The Sydney Morning Herald reports.

Compared to putting solar panels on the roof alone, integrating them into the façade would increase the surface area capable of harnessing the sun’s energy by an enormous amount. The ultimate goal is to allow the building to be completely off the grid in terms of electricity; a bit of an ambitious goal, even according to the designers themselves, but one they are pursuing nonetheless.

The high-rise has been designed with a curved exterior meant to capture the sun’s movement from east to west throughout the day. The resulting design is one that is functional, but elegant in terms of aesthetics, as well.

In an effort to get the building to be as self-sufficient as possible in terms of its energy requirements, solar materials are being sourced from China, wind turbines will be fitted on the roof, double-glazed glass will be used, and low-energy LED lighting will be included throughout.

Overall, the façade is expected to include around 3000 sm of solar panels with an additional 300 sm of panels added to the roof. Currently, the design for Sol Invictus Tower would provide more than 50 percent of the tower’s base load power, but technological advances over the next two years, before construction beings, are expected to increase that percentage.

The apartment building will offer a mix of one-, two-, and three-bedroom apartments in addition to public and private amenities such as a childcare center and a medical center.

ICR Property Group is the developer for the project.

Related Stories

High-rise Construction | Jun 1, 2018

CTBUH names 2018 Best Tall Building Worldwide, among nine other award winners

Oasia Downtown Hotel named “Best Tall Building Worldwide” for 2018.

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

High-rise Construction | May 18, 2018

The 100 tallest buildings ever conventionally demolished

The list comes from a recent CTBUH study.

High-rise Construction | May 14, 2018

Register before it’s too late: 2018 Tall + Urban Innovation Conference

The conference explores and celebrates the very best in innovative tall buildings, urban spaces, building technologies, and construction practices from around the world. 

Multifamily Housing | Apr 24, 2018

Adrian Smith + Gordon Gill Architecture designs 47-story condo tower in Miami

The tower will be located in Miami’s South Brickell neighborhood.

High-rise Construction | Apr 17, 2018

Developers reveal plans for 1,422-foot-tall skyscraper in Chicago

The tower would be the second tallest in the city.

Wood | Feb 15, 2018

Japanese company announces plans for the world’s tallest wooden skyscraper

The planned tower would rise 350 meters (1148 feet).

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021