The performing arts center of the future

Performing Arts Centers

The performing arts center of the future

For more than 15 years, LPA has completed many projects for the East Central Independent School District (ECISD), and the Performing Arts Center is just one example of how a research-based, collaborative process can improve outcomes.


By Mark Oppelt | May 8, 2017

As designers, we look to inform the design process with an understanding of purpose and function before creating a concept. How will this building be used? Who will be using it? How can we create long-term value for our client? What precedents are there? This informed approach was taken in the design for East Central High School’s Performing Arts Center in San Antonio.

For more than 15 years, LPA has completed many projects for the East Central Independent School District (ECISD), and the Performing Arts Center is just one example of how a research-based, collaborative process can improve outcomes.Totaling 37,500 square feet, the building design includes a 1,000-seat auditorium with lobby and stage 6,800 square feet of theater program space with dressing rooms, costume/scene shop, full-scale rehearsal room, 3,250 square feet of choir space for an ensemble, sound/recording, uniform and office space as well as support areas such as concessions, restrooms and box office.

 

Inspired by the Arts

The design is inspired by the entire process of a theatrical performance production. At the project inception, LPA performed extensive research on the process of a theatrical production—from script writing and rehearsals to stage construction and performances. We designed the Performing Arts Center to display the timeline of the theatrical process.

The building is a literal reflection of this timeline, allowing the building to function as a teaching tool for the students and the community. At each phase in a production, the building displays careful curated and sequenced views in and out, simultaneously celebrating the process of a theater production and creating a “feedback loop” around the auditorium. This approach provides a public connection into each phase, announcing the dynamic act of theater production as just as important as the performance itself.

 

 

A Building with No Back

In the conceptual design phase, the integrated team conducted extensive site analysis to understand how the building was impacted by traffic flow, climate and the elements. In summary, this site had no natural “service zone”—a full chorus of circulation passed around each side of the building—LPA embraced the challenge of developing a “building with no back” by exposing it to both the campus and the community.

Though the performing arts center will be located on the school’s campus, it will be used by the entire district, and it is important that the building is recognized as a community resource.

 

Balancing Sun and Shade

East- and west-facing vertical fins and deep roof overhangs are thoughtfully positioned to mitigate the harsh South Texas sun and heat gain. Solar analysis was used to determine the appropriate location, spacing and depth of those elements in design. The emphasis on daylighting in key areas such as the lobby and rehearsal room will provide long-term cost savings in terms of a lower lighting load on the building.

 

Commitment to Cost-Saving

Being on budget and cost-effective is always part of our strategic approach to educational design. The careful organization of spaces around a focused circulation corridor yielded a building that was 9% more efficient than the projected square footage.

The auditorium itself directly benefited from the costs savings yielded, where top of the line acoustics and building technology are essential for future proofing the facility. We also thoughtfully used structurally-interrupted storefront instead of curtain wall to manage the cost of the full-height glass used throughout the space.

 

 

The Movement of Sound

The design team’s research into the science of acoustics directly shaped the auditorium interior. Acoustical diffusion and dispersion were needed in key areas. The accordion walls along the interior vary to reflect these acoustical necessities, reinforcing the idea that a building can be a teaching tool for the students.

The Performing Arts Center project at East Central High School is the final piece of a master plan for of the campus that has been implemented through two different bond issues over a 10-year period. The project is estimated to break ground this summer and will celebrate the dynamic art of theater production with the campus and community while showcasing innovative design solutions.

 

Mark Oppelt, Principal at LPA San Antonio, has provided project design and management expertise to more than 350 Texas K-12 schools, civic and religious project in the San Antonio.

Related Stories

| Sep 19, 2013

What we can learn from the world’s greenest buildings

Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.

| Sep 19, 2013

6 emerging energy-management glazing technologies

Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level. 

| Sep 19, 2013

Roof renovation tips: Making the choice between overlayment and tear-off

When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.

| Sep 11, 2013

BUILDINGChicago eShow Daily – Day 3 coverage

Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.

| Sep 10, 2013

BUILDINGChicago eShow Daily – Day 2 coverage

The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.

| Aug 26, 2013

What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets

BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets. 

| Aug 22, 2013

Energy-efficient glazing technology [AIA Course]

This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.

| Aug 14, 2013

Green Building Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest green design and construction firms. 

| Jul 29, 2013

2013 Giants 300 Report

The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.

| Jul 22, 2013

Cultural Facility Report [2013 Giants 300 Report]

Building Design+Construction's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2013 Giants 300 Report.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â