As designers, we look to inform the design process with an understanding of purpose and function before creating a concept. How will this building be used? Who will be using it? How can we create long-term value for our client? What precedents are there? This informed approach was taken in the design for East Central High School’s Performing Arts Center in San Antonio.
For more than 15 years, LPA has completed many projects for the East Central Independent School District (ECISD), and the Performing Arts Center is just one example of how a research-based, collaborative process can improve outcomes.Totaling 37,500 square feet, the building design includes a 1,000-seat auditorium with lobby and stage 6,800 square feet of theater program space with dressing rooms, costume/scene shop, full-scale rehearsal room, 3,250 square feet of choir space for an ensemble, sound/recording, uniform and office space as well as support areas such as concessions, restrooms and box office.
Inspired by the Arts
The design is inspired by the entire process of a theatrical performance production. At the project inception, LPA performed extensive research on the process of a theatrical production—from script writing and rehearsals to stage construction and performances. We designed the Performing Arts Center to display the timeline of the theatrical process.
The building is a literal reflection of this timeline, allowing the building to function as a teaching tool for the students and the community. At each phase in a production, the building displays careful curated and sequenced views in and out, simultaneously celebrating the process of a theater production and creating a “feedback loop” around the auditorium. This approach provides a public connection into each phase, announcing the dynamic act of theater production as just as important as the performance itself.
A Building with No Back
In the conceptual design phase, the integrated team conducted extensive site analysis to understand how the building was impacted by traffic flow, climate and the elements. In summary, this site had no natural “service zone”—a full chorus of circulation passed around each side of the building—LPA embraced the challenge of developing a “building with no back” by exposing it to both the campus and the community.
Though the performing arts center will be located on the school’s campus, it will be used by the entire district, and it is important that the building is recognized as a community resource.
Balancing Sun and Shade
East- and west-facing vertical fins and deep roof overhangs are thoughtfully positioned to mitigate the harsh South Texas sun and heat gain. Solar analysis was used to determine the appropriate location, spacing and depth of those elements in design. The emphasis on daylighting in key areas such as the lobby and rehearsal room will provide long-term cost savings in terms of a lower lighting load on the building.
Commitment to Cost-Saving
Being on budget and cost-effective is always part of our strategic approach to educational design. The careful organization of spaces around a focused circulation corridor yielded a building that was 9% more efficient than the projected square footage.
The auditorium itself directly benefited from the costs savings yielded, where top of the line acoustics and building technology are essential for future proofing the facility. We also thoughtfully used structurally-interrupted storefront instead of curtain wall to manage the cost of the full-height glass used throughout the space.
The Movement of Sound
The design team’s research into the science of acoustics directly shaped the auditorium interior. Acoustical diffusion and dispersion were needed in key areas. The accordion walls along the interior vary to reflect these acoustical necessities, reinforcing the idea that a building can be a teaching tool for the students.
The Performing Arts Center project at East Central High School is the final piece of a master plan for of the campus that has been implemented through two different bond issues over a 10-year period. The project is estimated to break ground this summer and will celebrate the dynamic art of theater production with the campus and community while showcasing innovative design solutions.
Mark Oppelt, Principal at LPA San Antonio, has provided project design and management expertise to more than 350 Texas K-12 schools, civic and religious project in the San Antonio.
Related Stories
| Aug 11, 2010
Curtain rises on Broadway's first green theater
The Durst Organization and Bank of America have opened New York's first LEED-certified theater, the 1,055-seat Henry Miller's Theatre. Located inside the new 55-story Bank of America Tower at One Bryant Park, the 50,000-sf theater is located behind the preserved and restored neo-Georgian façade of the original 1918 theater.
| Aug 11, 2010
Restoration gives new life to New Formalism icon
The $30 million upgrade, restoration, and expansion of the Mark Taper Forum in Los Angeles was completed by the team of Rios Clementi Hale Studios (architect), Harley Ellis Devereaux (executive architect/MEP), KPFF (structural engineer), and Taisei Construction (GC). Work on the Welton Becket-designed 1967 complex included an overhaul of the auditorium, lighting, and acoustics.
| Aug 11, 2010
Gold Award: Eisenhower Theater, Washington, D.C.
The Eisenhower Theater in the John F. Kennedy Center for the Performing Arts in Washington, D.C., opened in 1971. By the turn of the century, after three-plus decades of heavy use, the 1,142-seat box-within-a-box playhouse on the Potomac was starting to show its age. Poor lighting and tired, worn finishes created a gloomy atmosphere.
| Aug 11, 2010
Giants 300 University Report
University construction spending is 13% higher than a year ago—mostly for residence halls and infrastructure on public campuses—and is expected to slip less than 5% over the next two years. However, the value of starts dropped about 10% in recent months and will not return to the 2007–08 peak for about two years.
| Aug 11, 2010
Bowing to Tradition
As the home to Harvard's Hasty Pudding Theatricals—the oldest theatrical company in the nation—12 Holyoke Street had its share of opening nights. In April 2002, however, the Faculty of Arts and Sciences decided the 1888 Georgian Revival building no longer met the needs of the company and hired Boston-based architect Leers Weinzapfel Associates to design a more contemporary facility.
| Aug 11, 2010
Team Tames Impossible Site
Rensselaer Polytechnic Institute, the nation's oldest technology university, has long prided itself on its state-of-the-art design and engineering curriculum. Several years ago, to call attention to its equally estimable media and performing arts programs, RPI commissioned British architect Sir Nicholas Grimshaw to design the Curtis R.
| Aug 11, 2010
Silver Award: Hanna Theatre, Cleveland, Ohio
Between February 1921 and November 1922 five theaters opened along a short stretch of Euclid Avenue in downtown Cleveland, all of them presenting silent movies, legitimate theater, and vaudeville. During the Great Depression, several of the theaters in the unofficial “Playhouse Square” converted to movie theaters, but they all fell into a death spiral after World War II.
| Aug 11, 2010
Biograph Theater
Located in Chicago's Lincoln Park neighborhood, Victory Gardens Theater Company has welcomed up-and-coming playwrights for 33 years. In 2004, the company expanded its campus with the purchase of the Biograph Theater for its new main stage. Built in 1914, the theater was one of the city's oldest remaining neighborhood movie houses, and it was part of Chicago's gangster lore: in 1934, John Dillin...
| Aug 11, 2010
Platinum Award: Reviving Oakland's Uptown Showstopper
The story of the Fox Oakland Theater is like that of so many movie palaces of the early 20th century. Built in 1928 based on a Middle Eastern-influenced design by architect Charles Peter Weeks and engineer William Peyton Day, the 3,400-seat cinema flourished until the mid-1960s, when the trend toward smaller multiplex theaters took its toll on the Fox Oakland.