A new master plan from Perkins+Will's LA studio creates a village-like business community in the Cauca River valley in Cali, Colombia.
The development, dubbed Zonamerica Cali, positions a variety of building typologies around a central pedestrian Paseo. The buildings are served by nearby parking in a secure landscaped park-like setting. Zonamerica will offer amenities and tenant services such as education/training services, recruiting, and transportation.
The master plan will create a sustainable village that leverages the outdoor environment and minimizes energy consumption. Two large office buildings, of approximately 24,000 sm and 26,000 sm, will form Phase 1 of the development. The buildings will be designed around open-air atrium lobbies with a grand staircase the connects all of the floors. Ground level lobbies will be served by breezeways and covered pedestrian arcades that lead to casual lounge areas, concierge services, and open meeting areas. A landscaped central plaza will be placed between the two stone and glass, solar-shaded office buildings.
Rendering courtesy of Perkins+Will's LA studio.
On the opposite side of the buildings will be the first phase of the Zonamerica Paseo, a pedestrian environment that will be the heart of the community. The Paseo will provide restaurants, services, and be the interactive social space of the development.
When complete, Zonamerica Cali will have 18 buildings, the capacity for over 17,000 employees, a 1,000 sm tier IV data center, 34,000 sm of landscaped area, and 173,000 sm of total constructed area.
Rendering courtesy of Perkins+Will's LA studio.
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.
| Apr 3, 2012
Luxury hotel 'groundscraper' planned in abandoned quarry
Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.