In late June, Pfizer, the nation’s second-largest pharmaceutical supplier, broke ground on BioPlace, a $250 million, 285,000-sf R&D and process development facility in Chesterfield, Mo.
The new campus, when completed in mid 2019, will house the company’s BioTherapeutics Pharmaceutical Sciences Group, and consolidate more than 450 employees who currently work at multiple locations around St. Louis, including some who working out of leased space in Monsanto’s research center.
Pfizer intends to hire 80 more employees over the coming years to support research at this 32-acre site.
The 32-acre campus will allow Pfizer to consolidate more than 450 of its employees who are scattered at various leased sites around St. Lous. Image: Clayco
The focus of this facility, according to Pfizer’s website, will be on advancing the company’s portfolio in biologics, vaccines, and gene therapy by “developing manufacturing processes and dosage forms applying state-of-the-art analytical technologies.”
The campus will feature a floor plan with flexible laboratory layouts, scientific casework and utility hookups, open office and collaboration spaces, and increased conferencing technologies where researchers can collaborate.
A partnership of Forum Studio and Ewing Cole designed the architecture, landscaping, engineering, interior, and lab process areas for BioPlace’s research and office spaces. Clayco is the design-builder on this project in tandem with its development subsidiary CRG.
Once completed, Pfizer will lease the space from Clayco and CRG, which is providing turnkey build-to-suit services, according to the St. Louis Post-Dispatch.
Related Stories
Data Centers | Nov 28, 2022
Data centers are a hot market—don't waste the heat!
SmithGroup's Brian Rener shares a few ways to integrate data centers in mixed-use sites, utilizing waste heat to optimize the energy demands of the buildings.
School Construction | Oct 31, 2022
Claremont McKenna College science center will foster integrated disciplinary research
The design of the Robert Day Sciences Center at Claremont McKenna College will support “a powerful, multi-disciplinary, computational approach to the grand socio-scientific challenges and opportunities of our time—gene, brain, and climate,” says Hiram E. Chodosh, college president.
Higher Education | Oct 24, 2022
Wellesley College science complex modernizes facility while preserving architectural heritage
A recently completed expansion and renovation of Wellesley College’s science complex yielded a modernized structure for 21st century STEM education while preserving important historical features.
Laboratories | Oct 5, 2022
Bigger is better for a maturing life sciences sector
CRB's latest report predicts more diversification and vertical integration in research and production.
Laboratories | Sep 12, 2022
Lab space scarcity propels construction demand in life sciences sector
In its 2021 Life Sciences Real Estate Outlook, JLL predicted that access to talent would be a primary concern for an industry sector that had been growing by leaps and bounds. A year later, talent still guides real estate decisions. But market conditions of a different sort were cooling the biotech field: namely, investors that have soured on startups which underperformed after going public. What this means for new construction and renovation going forward is unpredictable, as the drivers behind life sciences’ surge are still palpable.
| Sep 2, 2022
New UMass Medical School building enables expanded medical class sizes, research labs
A new nine-story, 350,000 sf biomedical research and education facility under construction at the University of Massachusetts Chan Medical School in Worcester, Mass., will accommodate larger class sizes and extensive lab space.
Giants 400 | Aug 22, 2022
Top 70 Science + Technology Facility Contractors + CM Firms 2022
Whiting-Turner, Hensel Phelps, DPR Construction, and Skanska USA top the rankings of the nation's largest science and technology (S+T) facility contractors and construction management (CM) firms, as reported in Building Design+Construction's 2022 Giants 400 Report.
Giants 400 | Aug 22, 2022
Top 70 Science + Technology Facility Engineering + EA Firms 2022
Jacobs, CRB, Fluor, and Affiliated Engineers Inc. head the rankings of the nation's largest science and technology (S+T) facility engineering and engineering/architecture (EA) firms, as reported in Building Design+Construction's 2022 Giants 400 Report.
Giants 400 | Aug 22, 2022
Top 100 Science + Technology Facility Architecture + AE Firms 2022
HDR, Flad Architects, Gensler, and DGA top the rankings of the nation's largest science and technology (S+T) facility architecture and architecture/engineering (AE) firms, as reported in Building Design+Construction's 2022 Giants 400 Report.
Giants 400 | Aug 22, 2022
Top 45 Laboratory Facility Contractors and Construction Management Firms for 2022
Whiting-Turner, Hensel Phelps, McCarthy, and STO Building Group top the ranking of the nation's largest science and technology (S+T) laboratory facility contractors and construction management (CM) firms, as reported in Building Design+Construction's 2022 Giants 400 Report.