flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

PGAL acquires Dallas-based Pro Forma Architecture

Architects

PGAL acquires Dallas-based Pro Forma Architecture

The merger adds a firm that has specialized in municipal projects.


By John Caulfield, Senior Editor | March 16, 2016

The fire station in Allen, Texas, which opened in 2012, is a prime example of Pro Forma's expertise in designing municipal buildings. Image: Courtesy of PGAL

Pro Forma Architecture, a 17-year-old Dallas-based firm, has merged with PGAL, an international architectural and engineering firm based in Houston and operating nine other offices in the U.S. and one in Mexico City.

Founded in 1946, PGAL employs more than 200 architects, planners, engineers, and designers. It has a wide-ranging portfolio in office, transportation, hospitality, education, healthcare, recreation, and government. (PGAL just got the okay from the city council at College Station, Texas, for a $1.96 million contract to design a new police station that will sit on 12 acres of city-owned property.)

Pro Forma specializes in designing municipal projects like libraries, senior centers, and fire and police stations. Through this merger, PGAL will expand Pro Forma’s expertise for its growing client list in Texas’s north and central regions.

“Now, there’s no projects we can’t pursue.”

– Jeff Bulla, Co-founder of Pro Forma

Jeff Bulla, AIA, LEED AP BD+C, Pro Forma’s co-founder, is staying on as Principal at PGAL’s Dallas office. He and his company’s four employees moved into PGAL’s office in January.

The 54-year-old Bulla tells BD+C that he began to question Pro Forma’s ability to compete as an independent firm in North Texas when the last recession was raging in 2008-2009. “The big firms started fishing in my pond and going after everything in sight,” he recalls. That made it harder for Pro Forma to get projects and offer competitive packages.

Bulla says he’d been approached by a number of firms about merger opportunities over the past 18 months, but nothing came of those conversations until PGAL came calling last October. At the time PGAL was going through a leadership transition in its Dallas office, which has been around since the early 1990s.

Pro Forma was on PGAL’s radar, says Bulla, because the two firms had competed for projects in several Texas markets, including PGAL’s home base in Houston. “They decided to look for a firm that already had an established reputation,” says Bulla.

He says he was attracted to PGAL’s culture and values, particularly its requirement that all of its principals be actively involved in projects. “I was impressed when I heard that the CEO had an office on the production floor.”

Bulla notes that PGAL’s operations are cloud-based, making collaboration among its offices around the country much easier and more likely. He also singles out PGAL’s generous employee-benefits package, and the company’s commitment to maintaining a stable workforce by shifting jobs among its offices depending on workload, as contributing factors to his decision to sell Pro Forma.

“Now, there’s no projects we can’t pursue,” says Bulla, who is especially eager to take advantage of corporate relocations to Texas. To bolster the Dallas office, he says “we’re looking for talent,” specifically “creative interns proficient in Revit.” He intends to add project architects and managers, and is looking longer term toward possibly adding an engineering principal to the office. 

 

 

Related Stories

| Aug 11, 2010

Wisconsin becomes the first state to require BIM on public projects

As of July 1, the Wisconsin Division of State Facilities will require all state projects with a total budget of $5 million or more and all new construction with a budget of $2.5 million or more to have their designs begin with a Building Information Model. The new guidelines and standards require A/E services in a design-bid-build project delivery format to use BIM and 3D software from initial ...

| Aug 11, 2010

Opening night close for Kent State performing arts center

The curtain opens on the Tuscarawas Performing Arts Center at Kent State University in early 2010, giving the New Philadelphia, Ohio, school a 1,100-seat multipurpose theater. The team of Legat & Kingscott of Columbus, Ohio, and Schorr Architects of Dublin, Ohio, designed the 50,000-sf facility with a curving metal and glass façade to create a sense of movement and activity.

| Aug 11, 2010

Residence hall designed specifically for freshman

Hardin Construction Company's Austin, Texas, office is serving as GC for the $50 million freshman housing complex at the University of Houston. Designed by HADP Architecture, Austin, the seven-story, 300,000-sf facility will be located on the university's central campus and have 1,172 beds, residential advisor offices, a social lounge, a computer lab, multipurpose rooms, a fitness center, and a...

| Aug 11, 2010

News Briefs: GBCI begins testing for new LEED professional credentials... Architects rank durability over 'green' in product attributes... ABI falls slightly in April, but shows market improvement

News Briefs: GBCI begins testing for new LEED professional credentials... Architects rank durability over 'green' in product attributes... ABI falls slightly in April, but shows market improvement

| Aug 11, 2010

Luxury Hotel required faceted design

Goettsch Partners, Chicago, designed a new five-star, 214-room hotel for the King Abdullah Financial District (KAFD) in Riyadh, Saudi Arabia. The design-build project, with Saudi Oger Ltd. as contractor and Rayadah Investment Co. as developer, has a three-story podium supporting a 17-story glass tower with a nine-story opening that allows light to penetrate the mass of the building.

| Aug 11, 2010

Three Schools checking into L.A.'s Ambassador Hotel site

Pasadena-based Gonzalez Goodale Architects is designing three new schools for Los Angeles Unified School District's Central Wilshire District. The $400 million campus, located on the site of the former Ambassador Hotel, will house a K-5 elementary school, a middle school, a high school, a shared recreation facility (including soccer field, 25-meter swimming pool, two gymnasiums), and a new publ...

| Aug 11, 2010

New Jersey's high-tech landscaping facility

Designed to enhance the use of science and technology in Bergen County Special Services' landscaping programs, the new single-story facility at the technical school's Paramus campus will have 7,950 sf of classroom space, a 1,000-sf greenhouse (able to replicate different environments, such as rainforest, desert, forest, and tundra), and 5,000 sf of outside landscaping and gardening space.

| Aug 11, 2010

U.S. firm designing massive Taiwan project

MulvannyG2 Architecture is designing one of Taipei, Taiwan's largest urban redevelopment projects. The Bellevue, Wash., firm is working with developer The Global Team Group to create Aquapearl, a mixed-use complex that's part of the Taipei government's "Good Looking Taipei 2010" initiative to spur redevelopment of the city's Songjian District.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021