flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

PGAL acquires Dallas-based Pro Forma Architecture

Architects

PGAL acquires Dallas-based Pro Forma Architecture

The merger adds a firm that has specialized in municipal projects.


By John Caulfield, Senior Editor | March 16, 2016

The fire station in Allen, Texas, which opened in 2012, is a prime example of Pro Forma's expertise in designing municipal buildings. Image: Courtesy of PGAL

Pro Forma Architecture, a 17-year-old Dallas-based firm, has merged with PGAL, an international architectural and engineering firm based in Houston and operating nine other offices in the U.S. and one in Mexico City.

Founded in 1946, PGAL employs more than 200 architects, planners, engineers, and designers. It has a wide-ranging portfolio in office, transportation, hospitality, education, healthcare, recreation, and government. (PGAL just got the okay from the city council at College Station, Texas, for a $1.96 million contract to design a new police station that will sit on 12 acres of city-owned property.)

Pro Forma specializes in designing municipal projects like libraries, senior centers, and fire and police stations. Through this merger, PGAL will expand Pro Forma’s expertise for its growing client list in Texas’s north and central regions.

“Now, there’s no projects we can’t pursue.”

– Jeff Bulla, Co-founder of Pro Forma

Jeff Bulla, AIA, LEED AP BD+C, Pro Forma’s co-founder, is staying on as Principal at PGAL’s Dallas office. He and his company’s four employees moved into PGAL’s office in January.

The 54-year-old Bulla tells BD+C that he began to question Pro Forma’s ability to compete as an independent firm in North Texas when the last recession was raging in 2008-2009. “The big firms started fishing in my pond and going after everything in sight,” he recalls. That made it harder for Pro Forma to get projects and offer competitive packages.

Bulla says he’d been approached by a number of firms about merger opportunities over the past 18 months, but nothing came of those conversations until PGAL came calling last October. At the time PGAL was going through a leadership transition in its Dallas office, which has been around since the early 1990s.

Pro Forma was on PGAL’s radar, says Bulla, because the two firms had competed for projects in several Texas markets, including PGAL’s home base in Houston. “They decided to look for a firm that already had an established reputation,” says Bulla.

He says he was attracted to PGAL’s culture and values, particularly its requirement that all of its principals be actively involved in projects. “I was impressed when I heard that the CEO had an office on the production floor.”

Bulla notes that PGAL’s operations are cloud-based, making collaboration among its offices around the country much easier and more likely. He also singles out PGAL’s generous employee-benefits package, and the company’s commitment to maintaining a stable workforce by shifting jobs among its offices depending on workload, as contributing factors to his decision to sell Pro Forma.

“Now, there’s no projects we can’t pursue,” says Bulla, who is especially eager to take advantage of corporate relocations to Texas. To bolster the Dallas office, he says “we’re looking for talent,” specifically “creative interns proficient in Revit.” He intends to add project architects and managers, and is looking longer term toward possibly adding an engineering principal to the office. 

 

 

Related Stories

| Aug 11, 2010

Florida mixed-use complex includes retail, residential

The $325 million Atlantic Plaza II lifestyle center will be built on 8.5 acres in Delray Beach, Fla. Designed by Vander Ploeg & Associates, Boca Raton, the complex will include six buildings ranging from three to five stories and have 182,000 sf of restaurant and retail space. An additional 106,000 sf of Class A office space and a residential component including 197 apartments, townhouses, ...

| Aug 11, 2010

Restoration gives new life to New Formalism icon

The $30 million upgrade, restoration, and expansion of the Mark Taper Forum in Los Angeles was completed by the team of Rios Clementi Hale Studios (architect), Harley Ellis Devereaux (executive architect/MEP), KPFF (structural engineer), and Taisei Construction (GC). Work on the Welton Becket-designed 1967 complex included an overhaul of the auditorium, lighting, and acoustics.

| Aug 11, 2010

Best AEC Firms to Work For

2006 FreemanWhite Hnedak Bobo Group McCarthy Building Companies, Inc. Shawmut Design and Construction Walter P Moore 2007 Anshen+Allen Arup Bovis Lend Lease Cannon Design Jones Lang LaSalle Perkins+Will SmithGroup SSOE, Inc. Timothy Haahs & Associates, Inc. 2008 Gilbane Building Co. HDR KJWW Engineering Consultants Lord, Aeck & Sargent Mark G.

| Aug 11, 2010

High-Performance Workplaces

Building Teams around the world are finding that the workplace is changing radically, leading owners and tenants to reinvent corporate office buildings to compete more effectively on a global scale. The good news is that this means more renovation and reconstruction work at a time when new construction has stalled to a dribble.

| Aug 11, 2010

Great Solutions: Business Management

22. Commercial Properties Repositioned for University USE Tocci Building Companies is finding success in repositioning commercial properties for university use, and it expects the trend to continue. The firm's Capital Cove project in Providence, R.I., for instance, was originally designed by Elkus Manfredi (with design continued by HDS Architects) to be a mixed-use complex with private, market-...

| Aug 11, 2010

Nurturing the Community

The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.

| Aug 11, 2010

AIA Course: Historic Masonry — Restoration and Renovation

Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.

| Aug 11, 2010

BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey

The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...

| Aug 11, 2010

World's tallest all-wood residential structure opens in London

At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021