flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Plans for Hudson Yards skyscraper from Bjarke Ingels have officially been filed

High-rise Construction

Plans for Hudson Yards skyscraper from Bjarke Ingels have officially been filed

The 65-story tower will be primarily office space and has an estimated development cost of $3.2 billion


By David Malone, Associate Editor | October 5, 2016

Rendering courtesy of BIG

The Spiral, Bjarke Ingles 1,005-foot tower that will be located in the Hudson Yards development, is officially moving forward after developer Tishman Speyer filed plans for the building in late September.

The tower, despite reaching the 1,000-foot tall mark, will only be the fourth tallest of the planned buildings in the area, Curbed New York reports. The building gets its name from its most unique feature; vertical gardens that wrap, or spiral, around the entirety of the structure like a giant snake.

According to current plans, the ground floor will have 27,000 sf of retail while floors two through 62 will be used as office space. There is 2.2 million sf of space total. As Curbed reports, however, there are a few discrepancies with some of the building’s measurements. According to the Department of Buildings filing, The Spiral will rise 962 feet and have 64 stories. And while the property has 2.2 million zonable sf, the rentable space may actually total 2.85 million.

Regardless of some of those specifics, construction of the building is now officially set at 509 West 34th Street.

 

Rendering courtesy of BIG

 

Rendering courtesy of BIG

 

Rendering courtesy of BIG

 

Rendering courtesy of BIG

Related Stories

| Feb 13, 2013

'Vegetative tower' apartments to revive NYC site

A Manhattan site formerly slated for development with a "tower of cubes"—a now-defunct project by Santiago Calatrava—will be revived with a 998-foot, 300,000-sf apartment building by Morali Architects.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jul 2, 2012

San Francisco lays claim to the greenest building in North America

The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.

| Jun 13, 2012

Thornton Tomasetti founding principals receive CTBUH Fazlur R. Khan Lifetime Achievement Medal

This is the first time the CTBUH Board of Trustees has awarded the prize to two individuals jointly.

| Jun 6, 2012

KPF designs tower for Yongsan IBD

The master plan, created by Studio Daniel Libeskind, is a dynamic urban environment containing contributions from 19 different architects practicing in diverse locations around the globe.

| Jun 6, 2012

SOM urges Chicago tenants to partner with landlords to cut energy use

Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021