flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Plans to make over New York’s aging LaGuardia Airport are revealed

Airports

Plans to make over New York’s aging LaGuardia Airport are revealed

The complete redesign, devised by a panel of experts, would unify terminals, relieve ground traffic congestion, and install state-of-the-art amenities. 


By John Caulfield, Senior Editor | July 28, 2015
Plans to make over New York’s aging LaGuardia Airport are revealed

Construction on the first half of the new unified terminal is expected to be a $4 billion project. It will be managed by LaGuardia Gateway Partners, a new public private partnership chosen by the Port Authority of New York and New Jersey to build the project. Renderings: Port Authority of New York and New Jersey

The Board of Directors for Port Authority of New York and New Jersey is expected to give its final OK early next year to start the first half of construction on the rebuilding of New York’s LaGuardia Airport.

On Monday, New York Gov. Andrew Cuomo, with Vice President Joe Biden at his side, unveiled the airport’s comprehensive redesign, devised by a panel of architects, engineers, planners, and lawmakers that was chaired by Dan Tishman, vice chairman of AECOM Technology and chairman and CEO of Tishman Realty and Construction.

The panel’s report is an amalgam of the top design submissions presented by New York-based Dattner Architects, PRESENT Architecture, and SHoP Architects. It was not clear, though, whether any of these firms will end up being the designer on this project.

The panel’s vision calls for transforming the 76-year-old airport into a unified, single terminal with transportation access.

The plan would alleviate vehicular congestion that continues to plague this airport, which served nearly 27 million passengers in 2014.

The first half of this project, which is projected to cost  between $3.6 billion and $4 billion, is expected to take 18 months to complete and be open to passengers in 2019.

 

 

The second half of the new unified terminal would be executed by Delta Air Lines, whose plans to redevelop its terminals are expected to follow the same timeline as the first half of the construction.

LaGuardia, which once fancied itself as “the air gateway to America,” has deteriorated into one of the country’s most dilapidated and overburdened major airports. Its redesign would include the following:
• Demolish Terminal B—the 50-year-old Central Terminal—and thoroughly redevelop Terminals C and D to build a unified airport terminal to form a complete, efficient, and appealing experience for passengers;
• Build the new unified terminal 600 feet closer to the Grand Central Parkway coupled with an island-gate system that will create nearly two miles additional aircraft taxiways for better aircraft circulation and reduce gate delays that are frustrating for passengers and expensive for airlines;
• Appealing and significant terminal architecture with high ceilings, expansive natural lighting, and openness, designed so passengers intuitively understand the airport’s layout; automated tram to provide passengers with easier movement between the airport’s terminals;
• Business and conference center capabilities to meet the needs of the business traveler and local businesses;
• A sustainable and resilient airport that minimizes energy consumption, reduces harmful emissions, and protects critical infrastructure to keep the airport operational during a flood event;
• A design that accommodates a potential hotel, as well as future growth at the airport; and
• A Marine Air Terminal that is better integrated with the main airport via an automated tram or some other form of reliable and convenient mode of transportation.

The airport would also be designed to accommodate a future AirTrain that would bring passengers and visitors to a subway station in Queens. Ferry service to the Marine Air Terminal and, if feasible, to the east end of the airport, could be available. And improved road configuration would reduce congestion on the surrounding roadway network, including the Grand Central Parkway.

To assure accountability and progress of this project, the city is retaining a Master Planning firm (which it did not identify) to advise the Port Authority and the Governor, to translate the panel’s recommendations into an implementable master plan, and to coordinate airport development for the long-term. The Port Authority will establish a board committee to oversee airport development and implementation of the master plan.

The project is being financed and executed through a public-private partnership with LaGuardia Gateway Partners, a consortium that includes the giant contractor Skanska. It is projected to create 8,000 direct jobs and 10,000 indirect jobs.

 

Tags

Related Stories

| Jun 2, 2014

Parking structures group launches LEED-type program for parking garages

The Green Parking Council, an affiliate of the International Parking Institute, has launched the Green Garage Certification program, the parking industry equivalent of LEED certification.

| May 29, 2014

7 cost-effective ways to make U.S. infrastructure more resilient

Moving critical elements to higher ground and designing for longer lifespans are just some of the ways cities and governments can make infrastructure more resilient to natural disasters and climate change, writes Richard Cavallaro, President of Skanska USA Civil.

| May 23, 2014

Top interior design trends: Gensler, HOK, FXFOWLE, Mancini Duffy weigh in

Tech-friendly furniture, “live walls,” sit-stand desks, and circadian lighting are among the emerging trends identified by leading interior designers. 

| May 20, 2014

Kinetic Architecture: New book explores innovations in active façades

The book, co-authored by Arup's Russell Fortmeyer, illustrates the various ways architects, consultants, and engineers approach energy and comfort by manipulating air, water, and light through the layers of passive and active building envelope systems.

| May 19, 2014

What can architects learn from nature’s 3.8 billion years of experience?

In a new report, HOK and Biomimicry 3.8 partnered to study how lessons from the temperate broadleaf forest biome, which houses many of the world’s largest population centers, can inform the design of the built environment.

| May 13, 2014

19 industry groups team to promote resilient planning and building materials

The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.

| May 11, 2014

Final call for entries: 2014 Giants 300 survey

BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

| Apr 22, 2014

Bright and bustling: Grimshaw reveals plans for the Istanbul Grand Airport [slideshow]

In partnership with the Nordic Office of Architecture and Haptic Architects, Grimshaw Architects has revealed its plans for the terminal of what will be one of the world's busiest airports. The terminal is expected to serve 150 million passengers per year.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021