Oregon State University’s Reser Stadium is set to undergo a transformation project to become a best-in-class football facility with year-round amenities accessible by all students, athletes, faculty, and staff. Populous, in collaboration with SRG Partnership and design-build partner Hoffman Construction, has recently released the first renderings of the project.
The west side of the stadium will be entirely redesigned to feature a 360-degree concourse that will encourage Beaver fans to discover new experiences. Dubbed Beaver Street, the new concourse will create a connection, both in the bowl and on the counter course, helping to unify the fan experience and bring the entire facility together physically. It will be a first-of-its-kind in collegiate sports facilities, flipping the traditional design of a football concourse and turning it inside out with all amenities arranged so fans have an open-air direct view of the field.
Concession areas were reimagined to have more of a storefront appearance and traditional walkup stands have been replaced with fast-casual dining and self-service grab-and-go stores. Food and beverage offerings have been overhauled to more closely reflect the OSU fanbase through familiar local restaurants and regional fare.
Season ticket holders will have 1,600 chairback seats less than 80 feet from the field. The premium seating deck is 100 feet away from the sideline and will include loge boxes, living room boxes, club seats, and Founders Suite seats in one seating deck. All premium seating areas are covered and protected from the elements.
The lower level of the west side deck will house the new OSU Student Experience Center. The Center is vertically connected to the stadium’s club spaces, allowing the club to function as a multi-purpose event space for OSU and the greater Corvallis community.
A 35,000-sf Wellness Clinic addition will be located on the southeast corner of the stadium. This four-story facility will provide whole-student care, including primary care, counseling, and x-ray and laboratory services. New locker room facilities for visiting teams and a new press box structure are also included in the design.
The project is slated for completion in the summer of 2023.
Related Stories
| Dec 27, 2013
$1 billion 'city within a city' development approved by Coachella, Calif., city council
The mega development includes 7,800 homes, a retail center, office space, and nearly 350 acres of open space.
| Dec 13, 2013
Safe and sound: 10 solutions for fire and life safety
From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies.
| Dec 10, 2013
16 great solutions for architects, engineers, and contractors
From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.
| Dec 9, 2013
Tips for designing higher education's newest building type: the learning commons
In this era of scaled-down budgets, maximized efficiencies, new learning methods and social media’s domination of face time, college and university campuses are gravitating toward a new space type: the learning commons.
| Dec 4, 2013
First look: Dubai's winning bid for World Expo 2020 [slideshow]
Dubai has been chosen as the site of the 2020 World Expo. HOK led the design team that developed the master plan for the Expo, which is expected to draw more than 25 million visitors from October 2020 through April 2021.
| Dec 3, 2013
Historic Daytona International Speedway undergoing $400 million facelift
The Daytona International Speedway is zooming ahead on the largest renovation in the Florida venue’s 54-year history. Improvements include five redesigned guest entrances, an extended grandstand with 101,000 new seats, and more than 60 new trackside suites for corporate entertaining.
| Nov 27, 2013
Wonder walls: 13 choices for the building envelope
BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina.
| Nov 26, 2013
Video: Zaha Hadid's stadium for Qatar 2022 World Cup
Zaha Hadid Architects, in conjunction with AECOM, has released renderings for a major stadium being designed for the Qatar 2022 FIFA World Cup--an event that will involve up to nine stadiums.
| Nov 26, 2013
Construction costs rise for 22nd straight month in November
Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.
| Nov 25, 2013
Building Teams need to help owners avoid 'operational stray'
"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.