flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Preservation lawsuit over Chicago's Prentice Hospital dropped

Preservation lawsuit over Chicago's Prentice Hospital dropped

Legal hurdle cleared for demolition of iconic modernist structure 


By BD+C Staff | February 15, 2013
End of preservation suit allows demolition of iconic modernist structure.
With end of a preservation lawsuit, demolition of iconic modernist structure will proceed.

The National Trust for Historic Preservation and Landmarks Illinois have dropped a lawsuit alleging that the city of Chicago improperly denied landmark status to Prentice Women's Hospital, an iconic modernist structure designed in the 1970s by Bertrand Goldberg. Owner Northwestern University will now be free to go forward with its plan to build a major new biomedical research facility on the downtown site.

The Prentice demolition has been under dispute for several years, as preservation enthusiasts attempted to make the case that the building, with its quatrefoil concrete shell cantilevered over a narrow core, was worth saving. Last November, in contentious proceedings, the Commission on Chicago Landmarks granted the building landmark status and then removed the designation on the same day.

After a hearing in Cook County Circuit Court, the preservation groups decided not to proceed. "We continue to believe there were significant flaws with the process that granted and then removed landmark protection for Prentice," said the National Trust in an official statement. "However, we feel that the landmarks process has run its course."

National Trust Field Officer Christina Morris said the groups will continue to cooperate with the city on preservation of historic structures, and that the Prentice situation has brought important attention to the role of modernist architecture in the U.S. “We will continue to work with our partners to preserve the best of Chicago’s architectural heritage.”

(http://www.chicagotribune.com/news/local/breaking/chi-lawsuit-dropped-over-prentice-preservation-20130214,0,3552305.story)

Related Stories

Healthcare Facilities | Jun 27, 2023

A woman-led CM team manages the expansion and renovation of a woman-focused hospital in Nashville

This design-build project includes adding six floors for future growth.

Standards | Jun 26, 2023

New Wi-Fi standard boosts indoor navigation, tracking accuracy in buildings

The recently released Wi-Fi standard, IEEE 802.11az enables more refined and accurate indoor location capabilities. As technology manufacturers incorporate the new standard in various devices, it will enable buildings, including malls, arenas, and stadiums, to provide new wayfinding and tracking features.

Healthcare Facilities | Jun 14, 2023

Design considerations for behavioral health patients

The surrounding environment plays a huge role in the mental state of the occupants of a space, especially behavioral health patients whose perception of safety can be heightened. When patients do not feel comfortable in a space, the relationships between patients and therapists are negatively affected.

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

Healthcare Facilities | Jun 5, 2023

Modernizing mental health care in emergency departments: Improving patient outcomes

In today’s mental health crisis, there is a widespread shortage of beds to handle certain populations. Patients may languish in the ED for hours or days before they can be linked to an appropriate inpatient program. 

Healthcare Facilities | Jun 1, 2023

High-rise cancer center delivers new model for oncology care

Atlanta’s 17-story Winship Cancer Institute at Emory Midtown features two-story communities that organize cancer care into one-stop destinations. Designed by Skidmore, Owings & Merrill (SOM) and May Architecture, the facility includes comprehensive oncology facilities—including inpatient beds, surgical capacity, infusion treatment, outpatient clinics, diagnostic imaging, linear accelerators, and areas for wellness, rehabilitation, and clinical research.

Healthcare Facilities | May 19, 2023

A new behavioral health facility in California targets net zero energy

Shortly before Mental Health Awareness Month in May, development and construction firm Skanska announced the topping out of California’s first behavioral health facility—and the largest in the nation—to target net zero energy. Located in Redwood City, San Mateo County, Calif., the 77,610-sf Cordilleras Health System Replacement Project is slated for completion in late 2024.

3D Printing | May 12, 2023

World’s first 3D-printed medical center completed

3D construction printing reached new heights this week as the world’s first 3D-printed medical center was completed in Thailand.

Sustainability | May 11, 2023

Let's build toward a circular economy

Eric Corey Freed, Director of Sustainability, CannonDesign, discusses the values of well-designed, regenerative buildings.

Digital Twin | May 8, 2023

What AEC professionals should know about digital twins

A growing number of AEC firms and building owners are finding value in implementing digital twins to unify design, construction, and operational data.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021