The cost of goods and services used in construction climbed by a record-setting 4.3% in May and 24.3% over the past 12 months, jeopardizing contractors’ solvency and construction workers’ employment, according to an analysis by the Associated General Contractors of America of government data released today. Association officials urged the Biden administration to move more quickly to end tariffs and quotas that are adding to construction materials costs and availability problems.
“The increase in producer prices for construction materials over the past year far outstrips contractors’ ability to charge more for projects,” said Ken Simonson, the association’s chief economist. “That gap means contractors are being hit with huge costs that they did not anticipate and cannot pass on.”
The 24.3% increase in prices for materials used in construction from May 2020 to last month was nearly twice as great as in any previous year, Simonson said. Meanwhile, the producer price index for new nonresidential construction—a measure of what contractors say they would charge to erect five types of nonresidential buildings—rose only 2.8% over the past 12 months, as contractors held their profit expectations down in order to compete for a limited number of new projects.
Items with especially steep price increases over the past year covered a wide range of materials, including products made from wood, metals, plastics, and gypsum. The producer price index for lumber and plywood more than doubled—rocketing 111% from May 2020 to last month. The index for steel mill products climbed 75.6%, while the index for copper and brass mill shapes rose 60.4% and the index for aluminum mill shapes increased 28.6%. The index for plastic construction products rose 17.5%. The index for gypsum products such as wallboard climbed 14.1%. Fuel costs, which contractors pay directly to operate their own trucks and off-road equipment, as well as through surcharges on freight deliveries, have also jumped.
Association officials said the Biden administration can provide immediate relief from some of the price pressures by ending tariffs on Canadian lumber, along with tariffs and quotas on steel and aluminum from numerous countries. Officials said the administration took a first step today by announcing agreement on a working group with the European Union that will aim to end to tariffs on steel and aluminum from the EU by the end of 2021 but that much more tariff relief is needed, and sooner. The administration should also end the duty on Canadian softwood lumber, instead of doubling the rate, as the Commerce Department has proposed, the officials added.
“The administration is right to recognize that ending tariffs on our allies is good policy,” said Stephen E. Sandherr, the association’s chief executive officer. “But there is no reason to wait six months to adopt good measures. The president should go further, by ending tariffs and quotas on steel and aluminum from other trading partners as well as the European Union.”
View producer price index data. View chart of gap between input costs and bid prices.
Related Stories
Apartments | Aug 22, 2023
Key takeaways from RCLCO's 2023 apartment renter preferences study
Gregg Logan, Managing Director of real estate consulting firm RCLCO, reveals the highlights of RCLCO's new research study, “2023 Rental Consumer Preferences Report.” Logan speaks with BD+C's Robert Cassidy.
Market Data | Aug 18, 2023
Construction soldiers on, despite rising materials and labor costs
Quarterly analyses from Skanska, Mortenson, and Gordian show nonresidential building still subject to materials and labor volatility, and regional disparities.
Apartments | Aug 14, 2023
Yardi Matrix updates near-term multifamily supply forecast
The multifamily housing supply could increase by up to nearly 7% by the end of 2023, states the latest Multifamily Supply Forecast from Yardi Matrix.
Hotel Facilities | Aug 2, 2023
Top 5 markets for hotel construction
According to the United States Construction Pipeline Trend Report by Lodging Econometrics (LE) for Q2 2023, the five markets with the largest hotel construction pipelines are Dallas with a record-high 184 projects/21,501 rooms, Atlanta with 141 projects/17,993 rooms, Phoenix with 119 projects/16,107 rooms, Nashville with 116 projects/15,346 rooms, and Los Angeles with 112 projects/17,797 rooms.
Market Data | Aug 1, 2023
Nonresidential construction spending increases slightly in June
National nonresidential construction spending increased 0.1% in June, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. Spending is up 18% over the past 12 months. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.07 trillion in June.
Hotel Facilities | Jul 27, 2023
U.S. hotel construction pipeline remains steady with 5,572 projects in the works
The hotel construction pipeline grew incrementally in Q2 2023 as developers and franchise companies push through short-term challenges while envisioning long-term prospects, according to Lodging Econometrics.
Hotel Facilities | Jul 26, 2023
Hospitality building construction costs for 2023
Data from Gordian breaks down the average cost per square foot for 15-story hotels, restaurants, fast food restaurants, and movie theaters across 10 U.S. cities: Boston, Chicago, Las Vegas, Los Angeles, Miami, New Orleans, New York, Phoenix, Seattle, and Washington, D.C.
Market Data | Jul 24, 2023
Leading economists call for 2% increase in building construction spending in 2024
Following a 19.7% surge in spending for commercial, institutional, and industrial buildings in 2023, leading construction industry economists expect spending growth to come back to earth in 2024, according to the July 2023 AIA Consensus Construction Forecast Panel.
Contractors | Jul 13, 2023
Construction input prices remain unchanged in June, inflation slowing
Construction input prices remained unchanged in June compared to the previous month, according to an Associated Builders and Contractors analysis of U.S. Bureau of Labor Statistics Producer Price Index data released today. Nonresidential construction input prices were also unchanged for the month.
Contractors | Jul 11, 2023
The average U.S. contractor has 8.9 months worth of construction work in the pipeline, as of June 2023
Associated Builders and Contractors reported that its Construction Backlog Indicator remained unchanged at 8.9 months in June 2023, according to an ABC member survey conducted June 20 to July 5. The reading is unchanged from June 2022.