flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Radical proposal would transform Chicago’s Lake Shore Drive and create new lakefront park space

Green

Radical proposal would transform Chicago’s Lake Shore Drive and create new lakefront park space

Over 70 new acres of public space would be created between Ohio Street and North Avenue.


By David Malone, Associate Editor | February 10, 2017

Rendering courtesy of the Office of Brian Hopkins

Lake Shore Drive is one of the most famous streets in Chicago. With the skyline on one side and Lake Michigan on the other, it provides a nice snapshot of what the city has to offer. What it also provides, however, is traffic congestion and accidents.

A radical new proposal wants to not only rectify some of the issues associated with Lake Shore Drive, but also improve on some of the things that already make it such a popular area in Chicago.

According to Curbed Chicago, the proposal would straighten out Lake Shore Drive’s narrow and dangerous Oak Street S-bend and then bury it in what would become brand new public green space. 70 acres of brand new green space, in fact, that would provide new parkland, beaches, trails, and a breakwater island. These improvements would buffer the roadway from the crashing waves that can prove quite abusive in the winter months and also fix the Chicago Avenue bottleneck by removing traffic signals. New interchange ramps would also be added to improve traffic flow.

As is to be expected, these changes come at a cost, and quite a large cost at that. It is estimated the project would have a price tag as high as $500 million and require the cooperation of multiple locale, state, and federal entities to complete. If everything moves along smoothly, without any hiccups, the earliest this project would start is 2020, with a completion date many years later.

Even with the cost and time issues, the proposal is still seen as providing more good than harm to an area of the city that could use a makeover. 2nd Ward Alderman Brian Hopkins is one of the city’s biggest proponents of the plan and has spoken numerous times of its benefits to try and get it pushed through. As part of his efforts, he used renderings that were created in the summer of 2016 by VOA Associates, which has since become a part of Stantec. You can view some of those renderings below.

 

Rendering courtesy of the Office of Brian Hopkins.

 

Rendering courtesy of the Office of Brian Hopkins.

 

Rendering courtesy of the Office of Brian Hopkins.

 

Rendering courtesy of the Office of Brian Hopkins.

 

Rendering courtesy of the Office of Brian Hopkins.

 

Tags

Related Stories

Sports and Recreational Facilities | Nov 14, 2016

Soccer stadium from Zaha Hadid Architects will be constructed almost entirely of wood

The architects say the project will be the greenest soccer stadium in the world once completed.

Green | Oct 27, 2016

Applying modern energy codes to building envelope retrofits [AIA course]

When applying current energy codes to existing buildings, a number of issues arise, particularly where the building exterior is concerned, writes Hoffmann Architects' Bradley Carmichael. This AIA CES Discovery course is worth 1.0 AIA CES HSW learning unit.

Green | Oct 12, 2016

Acting as a giant air purifier, this tower could help solve China’s pollution problem

The 23-ft tall tower operates almost entirely on wind energy.

Codes and Standards | Oct 10, 2016

New sustainable landscape development and management credential launched

GBCI offered the first testing opportunity Oct. 3 at Greenbuild

Codes and Standards | Oct 6, 2016

Obama administration will spend $80 million for smart cities initiatives

The technology is targeted for climate, transportation, resiliency.

Lighting | Oct 6, 2016

Healthcare systems lighting their way to savings

There has been a rapid improvement and availability of LED products as primary light sources in most healthcare facility applications.

Green | Oct 6, 2016

AIA Report: Mixed results in design projects meeting 2030 Commitment targets

More buildings are meeting certain goals, but energy intensity reduction results have flat lined

Green | Oct 6, 2016

GBCI announces arc, a new technology organization to measure and compare green building performance

Arc is a platform that will allow any building to participate and immediately start measuring performance, make improvements, and benchmark against itself. 

Green | Oct 4, 2016

The Clear Orb is one of the shortlisted projects for 2016 Land Art Generator Initiative

Designed by Heerim Architects & Planners, The Clear Orb would produce just under 600 million gallons of clean water annually.

boombox1
boombox2
native1

More In Category

Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021