The Raymond F. Kravis Center for the Performing Arts in West Palm Beach Fla., is set to receive $50 million worth of upgrades that will increase the size of the center and make it more user-friendly.
Upgrades include increasing the size of the Dreyfoos Hall Lobby, implementing new technology throughout, creating a pedestrian-friendly plaza, adding a new valet parking garage, building a new entrance/exit ramp to the existing parking garage, and improving traffic flow on and around the campus.
See Also: Florida mixed-use development uses wellness as the backbone of its design
The lobby expansion will see the glass curtain wall extended out by 30 feet. This will add 6,000 sf to the Dreyfoos Hall Lobby, providing more room for guests and reducing wait times at the bar, bistro, and other service areas. The expansion will include additional seating and restrooms.
Courtesy Leo A Daly.
The new valet parking garage will reduce traffic congestion and improve safety around the Center. It will be located on the east side of the building on the site of the former Amphitheater. Meanwhile, the new entrance and exit ramp to the self-parking garage will offer guests an easier way to access the fourth and fifth levels and improve traffic congestion in the garage as a whole.
The new pedestrian urban plaza will provide a park-like space that gives guests easier access to the Center. The area will feature expanded sidewalks, a bike path, and a waterfall fountain.
Courtesy Leo A Daly.
Technology improvements throughout the Center include closed-circuit video monitoring of the garage and entire campus; updated marketing, Box Office, and public information technology; the installation of a barcode system for tickets for ease of entry and improved security; electronic wayfinding; and additional security screeners at venue entrances.
Leo A Daly designed the design-build project with the Weitz Company serving as the general contractor and the Wantman Group providing landscape design. Construction began in May 2018 and is slated for completion in 2020.
Courtesy Leo A Daly.
Courtesy Leo A Daly.
Related Stories
| May 14, 2012
Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons
Supertall two-tower complex located in Seoul’s Yongsan International Business District.
| Apr 30, 2012
KBE Building completes renovation at the ConnCAT
The $1.2 million project consisted of a 16,000-sf interior renovation.
| Apr 19, 2012
KTGY Group’s Arista Uptown Apartments in Broomfield, Colo. completed
First of eight buildings highlights unique amenities.
| Mar 29, 2012
Construction completed on Las Vegas’ newest performing arts center
The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Oct 11, 2011
Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center
For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment.
| Sep 9, 2011
Kauffman Center for the Performing Arts in Kansas City opens this month
Theatre Projects played the lead role in theatre design and planning as well as in engineering the customized theatre equipment. BNIM in Kansas City served as the executive architect.
| May 18, 2011
Carnegie Hall vaults into the 21st century with a $200 million renovation
Historic Carnegie Hall in New York City is in the midst of a major $200 million renovation that will bring the building up to contemporary standards, increase educational and backstage space, and target LEED Silver.
| Apr 12, 2011
Long-awaited San Francisco center is music to jazz organization’s ears
After 28 years, SFJAZZ is getting its first permanent home. The San Francisco-based nonprofit, which is dedicated to advancing the art of jazz through concerts and educational programs, contracted local design firm Mark Cavagnero Associates and general contractor Hathaway Dinwiddie to create a modern performance center in the city’s Hayes Valley neighborhood