Upon completion in 1894, the 17-story Arc at Old Colony became one of the tallest buildings in Chicago. In more recent times, its stylistically antiquated spaces, outmoded technology, and deteriorating infrastructure made it unsuitable for commercial use.
But owner Campus/MCJ Development JV saw the building’s 68-foot-wide vintage floor plans, voluminous lobby, and myriad elevators as perfect for redevelopment as a historically charming residential building.
The Building Team, helmed by design firm Pappageorge Haymes Partners, restored ornate turrets, a two-story terra cotta colonnade band, the projecting cornice, round oriel corner bays, and more than six hundred oversized windows.
Two exterior fire escapes were removed as part of the project, which meant that an enclosed staircase from the basement to the roof had to be built to provide a second means of egress. However, the building’s existing skin had large protruding cornices and brick kneels, which made the use of an outside hoist impossible.
So the team cleverly used a one-ton hoist to lift unitized sections of stairs up through the building and stage them on individual floors in three sections.
Courtesy Pappageorge Haymes Partners.
PROJECT SUMMARY
Silver Award Winner | Chicago, Ill.
Building Team: Pappageorge Haymes Partners (submitting firm, architect); Campus/MCJ Development JV (owner/developer); BKV Group (interior designer); Stearn-Joglekar (SE); AMS Mechanical Systems (ME); JMS Electrical Engineering; O’Sullivan Inc. (plumbing engineer); James McHugh Construction Co. (GC).
Details: 198,484 sf. Construction cost: $60 million. Construction time: February 2014 to July 2015. Delivery method: Design-build.
Related Stories
Reconstruction Awards | Nov 27, 2018
Bedford Square: Revivifying urbanity
A suburban mixed-use redevelopment restores ‘the lost art of living closely.'
Reconstruction Awards | Nov 26, 2018
Yarn works: Neverending yarn
111-year-old mill becomes a mixed-income multifamily community.
Reconstruction Awards | Nov 20, 2018
Wiseburn High School: New kind of P3
A California school district and a charter school system join forces to open a skills-based high school.
Reconstruction Awards | Nov 19, 2018
Kehoe Iron Works: Industrial strength makeover
A project team turns a toxic site into a civic treasure.
Reconstruction Awards | Nov 19, 2018
Weiser Hall, University of Michigan: Campus upgrade
A Mid-century building becomes home to a new International Institute.
Reconstruction Awards | Nov 16, 2018
Mass MoCA Building 6: The Robert W. Wilson Building
A textile mill becomes an arts center that energizes a New England town and its region.
Reconstruction Awards | Nov 15, 2018
Charles L. Tutt Library, Colorado College: Net-zero in the Rockies
Library expansion reinforces Colorado College’s commitment to carbon neutrality.
Reconstruction Awards | Nov 14, 2018
National Arts Centre: O, Canada
Three new wings and a flashy AV display add luster to the nation’s cultural gem.
Reconstruction Awards | Nov 13, 2018
20 Times Square: Conquering Times Square
The 20 Times Square mixed-used project at the corner of 47th and Seventh Avenue is indicative of the great lengths Building Teams will go in order to maximize real estate and media opportunities in Times Square.
Reconstruction Awards | Nov 12, 2018
Crosstown Concourse: An 'organic' urban village
Memphians band together to rebuild a gigantic Sears distribution facility into a multifaceted community crossroads.