flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction Awards: Bay Area Metro Center

Reconstruction Awards

Reconstruction Awards: Bay Area Metro Center

The structure’s 60,000-sf floor plates made the interior dark and foreboding, and BAHA wanted to improve working conditions for its employees and tenants. 


By BD+C Staff | November 16, 2016

The newly constructed eight-story atrium in the Bay Area Metro Center provides occupants with welcome daylight. The project is targeting LEED Gold certification. Mikki P. Green/ Mikki Piper Imaging.

The 525,000-sf Bay Area Metro Center, at 390 Main Street, San Francisco, was originally built by the federal government in 1942 to make armored vehicles. Three years ago, the owner, Bay Area Headquarters Authority, commissioned McCarthy Building Companies to lead a much-needed seismic upgrade and structural renovation. The structure’s 60,000-sf floor plates also made the interior dark and foreboding, and BAHA wanted to improve working conditions for its employees and tenants. 

The centerpiece is an eight-story atrium that brings natural light into the offices of BAHA, the Bay Area Toll Authority, the Metropolitan Transportation Commission, the Bay Area Air Quality Management District, the Association of Bay Area Governments, and the U.S. Drug Enforcement Agency.

The seismic upgrade meant that the contractor would have to drill 27,000 holes into the thick interior concrete walls and floor—a considerable safety risk. McCarthy worked with a team from UC San Francisco, UC Berkeley, and toolmaker Hilti to design a dual-headed drill rig that reduced worker fatigue and the volume of airborne concrete dust kicked up by the drilling.
Zero accidents were recorded.

 

PROJECT SUMMARY 

 

Silver Award Winner | San Francisco, Calif.

Building Team: McCarthy Building Companies (submitting firm, GC); Bay Area Headquarters Authority (owner); Perkins+Will (architect); TEF Design (interior architect); Holmes Culley (SE); WSP | Parsons Brinckerhoff (MEP); TEECOM (communications); and Harris & Associates (CM).

Details: 525,000 sf. Construction cost: $115 million. Construction time: January 2013 to April 2016. Delivery method: CM at risk.

Related Stories

Reconstruction Awards | Nov 12, 2018

Cincinnati Music Hall: Saving a cultural anchor

Cincinnati uses ‘skillful triage’ to bring its endangered Music Hall up to date.

Reconstruction Awards | Dec 1, 2017

Rescue mission: Historic movie palace is now the centerpiece of Baltimore’s burgeoning arts hub

In restoring the theater, the design team employed what it calls a “rescued ruin” preservation approach.

Reconstruction Awards | Dec 1, 2017

Gothic revival: The nation’s first residential college is meticulously restored

This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition.

Reconstruction Awards | Dec 1, 2017

Rockefeller remake: Iconic New York tower is modernized for its next life

To make way for new ground-floor retail and a more dramatic entrance and lobby, the team removed four columns at the ground floor.

Reconstruction Awards | Nov 30, 2017

BD+C's 2017 Reconstruction Award Winners

Provo City Center Temple, the Union Trust Building, and the General Motors Factory One are just a few of the projects recognized as 2017 Reconstruction Award winners.

Reconstruction Awards | Nov 29, 2017

College credit: Historic rehab saves 50% on energy costs

The project team conducted surveys of students, faculty, and staff to get their input.

Reconstruction Awards | Nov 29, 2017

Amazing grace: Renovation turns a church into elegant condos

The windows became The Sanctuary’s chief sales edge.

Reconstruction Awards | Nov 28, 2017

Broadway melody: Glass walls set just the right tone for a historic lobby in Lower Manhattan

The adaptation of the 45,000-sf neoclassical lobby at 195 Broadway created three retail spaces and a public walkway.

Reconstruction Awards | Nov 27, 2017

Higher education: The rebirth of a Washington, D.C., high school

The project team, led by architect Perkins Eastman, restored the original cupola.

Reconstruction Awards | Nov 27, 2017

Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer

The project team had to fix poor renovations made in the ’50s.

boombox1
boombox2
native1

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021