flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A Recreation Center’s Connected Design Brings the Edmonton Community Together

Sponsored Content

A Recreation Center’s Connected Design Brings the Edmonton Community Together


By Sherwin-Williams Coil Coatings | July 27, 2021
Commonwealth Rec Center
Commonwealth Rec Center

Go big or go home. That’s what the City of Edmonton and the Edmonton Eskimos Football Club decided in their joint project to revitalize the former Commonwealth Stadium in Edmonton, Alberta, Canada. In an effort to build up the area, the project transformed a vacant stadium ground into a vibrant, integrated facility for the entire community to use.

In the new building – that matches the scale of the neighboring stadium – four stories of space and a cascading promenade connect a gymnasium, aquatics hall and field house. The 220,000 square-foot Commonwealth Community Recreation Centre includes space for stadium activities, football operations, a community and fitness center, yoga studios, an indoor track, childcare center, and administrative offices. It is the second recreation center built in the area in almost 30 years.

Commonwealth Rec Center

Together, HIP Architects (now Kasian) and MJM Architects took the existing stadium fitness center built in 1978 and proposed the construction of an inclusive facility that combined the field house, fitness center, pool and Eskimos Football administration areas under one innovative and dynamic structure. Completed in 2012, the recreation center showcases an angular design that is a key feature of the facility. 

The architects also took a unique approach when it came to the materials they decided to use for the exterior of the recreation center. The use of Vicwest Tradition 100-4, .91mm pre-painted galvanized standing seam steel cladding gives the center its bold, steel roofline. These panels were ideal for the project because they are a versatile and flexible material that is able to wrap around the entire complex in a uniform, continuous fashion. The cost-effective cladding enhances the geometric features of the building envelope, from the canopy at the main entrance that slants upwards, to the panels on one side that carve inward to reveal wood that borders an expansive glass window – offering transparency into the facility. The metal also extends from the exterior, into the interior, connecting the full design together.

Vicwest steel panels deliver project efficiency and design excellence, with additional benefits stemming from the Fluropon® finish from Sherwin-Williams Coil Coatings that coats the metal. In the metallic color, Bright Silver, the field-proven exterior metal finish provides durability for the monumental structure, exceeding AAMA 2605 performance criteria and offering exceptional resistance to UV rays, outstanding color retention and consistency and high-film integrity. 

Durable materials will help the complex stand up to the daily wear and tear from constant use of the space. The Eskimos Football team makes great use of the pool, track and fitness center; the community has access to the field house and meeting rooms; and stadium operations host additional events in the field house.

Commonwealth Rec Center Workout Room View

Together, the City of Edmonton and the Edmonton Eskimos Football Club established a facility that added value to the neighborhood, created a year-round location that draws in the community and met the requirements for a LEED Silver Certification. With connected facilities, new amenities and a striking design, Edmonton residents consider the Commonwealth Community Recreation Centre as a community destination.

Tags

Related Stories

| Apr 29, 2013

Chicago Faucets redesigns website, adds Product Configurator for mix-and-match components and savings calculator

Chicago Faucets has redesigned its website at chicagofaucets.com, which embodies the company's innovation and commitment to the growing needs of its customers.

| Mar 21, 2013

Sloan president Jim Allen makes the case for the business of building green at Congressional Briefing

“The business case for green building has been proven,” said Jim Allen, President and CEO of Sloan, at a recent Congressional Briefing on Capitol Hill in Washington DC. Mr. Allen was invited by the U.S. Green Building Council (USGBC) to give his unique perspective as an American manufacturer supplying products to the Green Building Industry on what the green building movement has meant to his company.

| Oct 12, 2012

New HyTronic Edge from Chicago Faucets brings funky, modern aesthetics to restrooms

The Edge spout is cast entirely from ECAST low-lead brass to meet current lead reduction requirements as well as the forthcoming 2014 federal lead reduction law.

| Jul 3, 2012

TOLK now called Dewberry

The renaming indicates a simplification in Dewberry’s corporate naming conventions.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

AIA Course: High-Efficiency Plumbing Systems for Commercial and Institutional Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category


Plumbing

EPA to revise criteria for WaterSense faucets and faucet accessories

The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm). 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021