flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Redevelopment of Newark’s Bears Stadium site receives team of architects

Mixed-Use

Redevelopment of Newark’s Bears Stadium site receives team of architects

Lotus Equity Group selected Michael Green Architecture, TEN Aquitectos, Practice for Architecture and Urbanism, and Minno & Wasko Architects and Planners to work on the project.


By David Malone, Associate Editor | August 2, 2017
A rendering of Lotus Equity Group's Bears Stadium redevelopment

Rendering courtesy of Lotus Equity Group

Since bidding adieu to the minor league Newark Bears baseball team in 2013, Bears Stadium has been left vacant. The 6,200-seat stadium sits on eight acres adjacent to the waterfront and a short walk away from NJ Transit’s Broad Street station, which is accessible to Midtown Manhattan in 18 minutes.

In 2016, Lotus Equity Group purchased the stadium for $23 million with plans to redevelop the site into a 24/7 live-work-play community. The project will create up to 2,000 residential units, 400,000 sf of office space, large- and small-scale retail, and cultural and public open space in the emerging Broad Street Station section of downtown Newark.

Recently, Lotus Equity Group announced a team of four architecture firms that will be working on the project. The team includes Practice for Architecture and Urbanism, Michael Green Architecture, TEN Arquitectos, and Minno & Wasko Architects and Planners.

“When designing this site, it was important to us that our approach be focused on community engagement, inclusion, and transparency,” says Ben Korman, Chief Executive Officer and Founder of Lotus Equity Group, in a release. “We chose a team of architects that will not only create beautiful buildings, but also shares our commitment to urban planning and design that will thoughtfully support the urban renewal of Newark’s Central Ward.”

The project’s first phase of development is currently underway.

Related Stories

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Portland Cement Association offers blast resistant design guide for reinforced concrete structures

Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads.  It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.

| Aug 11, 2010

New website highlights government tax incentives for large commercial buildings

Energy Retrofit Group (ERG), the subsidiary of 40-year-old, award-winning Adache Group Architects, Inc., has announced the creation of their new energy conservation web site: www.energy-rg.com.

| Aug 11, 2010

Gensler, HOK, HDR among the nation's leading reconstruction design firms, according to BD+C's Giants 300 report

A ranking of the Top 100 Reconstruction Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

The Joule Hotel
Dallas, Texas

The Joule Hotel in Dallas, designed by local firm Coburn & Smith, was constructed in 1927 as the Dallas National Bank Building. Originally one of the finest examples of gothic revival architecture in Texas, it had had most of its gothic elements removed over the years after being converted into an office building and later abandoned. What was left had fallen into disrepair.

| Aug 11, 2010

AECOM, WATG top BD+C's ranking of the nation's 75 largest hotel design firms

A ranking of the Top 75 Hotel Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021