flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Restoration of Chicago’s Union Station Great Hall completes

Reconstruction & Renovation

Restoration of Chicago’s Union Station Great Hall completes

Goettsch Partners designed the project.


By David Malone, Associate Editor | February 7, 2019
Great Hall skylight and interior after restoration

All images © Amtrak, courtesy Goettsch Partners

Chicago’s Union Station Great Hall, originally designed in 1925, needed substantial repairs due to water leakage and deterioration due to flaws in the original design. The Great Hall restoration project was the most recent in a series of Union Station restoration projects that began in 2010.

Goettsch Partners began the $22-million dollar Great Hall project over three years ago. The design team renovated the station’s 219-foot-long skylight, which experienced extensive moisture damage over the past several decades. An energy-efficient, modern skylight was designed and built five feet above the original cast-iron skylight. The new skylight comprises steel and 858 panes of clear, high-efficiency glass that protects the building while brightening the Great hall interiors with 50% more natural daylight than before.

 

 

Chicago Union Station Great hall East Elevation

See Also: Art-focused hotel will be the first to open in the Dallas Arts District

 

Other aspects of the restoration included structural improvements, new plumbing, plaster repair, restored ornamentation, and new lighting. The architectural team removed layers of paint to reveal the original coloration of the Great Hall’s ornate plasterwork and then restored the station to its original color scheme. Additionally, a new elevator was installed and 24 ceiling chandeliers and two figural sculptures were restored.

Workers used a suspended work deck with swing stages, as opposed to conventional floor-mounted scaffolding, so work could proceed without interrupting the commute of the 120,000 daily travelers.

 

Old skylight and new skylight for Union Station Great Hall

 

New Great Hall skylight

Related Stories

| Feb 1, 2012

Blackney Hayes designs school for students with learning differences

The 63,500 sf building allows AIM to consolidate its previous two locations under one roof, with room to expand in the future. 

| Jan 31, 2012

28th Annual Reconstruction Awards: Modern day reconstruction plays out

A savvy Building Team reconstructs a Boston landmark into a multiuse masterpiece for Suffolk University. 

| Jan 31, 2012

Chapman Construction/Design: ‘Sustainability is part of everything we do’

Chapman Construction/Design builds a working culture around sustainability—for its clients, and for its employees.

| Jan 30, 2012

Hollister Construction Services to renovate 30 Montgomery Street in Jersey City, N.J.

Owner Onyx Equities hires firm to oversee comprehensive upgrades of office building.

| Jan 26, 2012

Hendrick Construction completes Osso Restaurant in Charlotte

Designed by François Fossard, Osso's upscale interior includes tapered, twisted decorative columns and an elegant fireplace in the center of the lounge. 

| Jan 26, 2012

Summit Design+Build completes law office in Chicago

Applegate & Thorne-Thomsen's new office suite features private offices, open office area, conference rooms, reception area, exposed wood beams and columns, and exposed brick. 

| Jan 19, 2012

LEED puts the 'Gold' in Riverside golden arches

McDonald's restaurant recognized for significant energy savings.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.



Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021