flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Restoration of Chicago’s Union Station Great Hall completes

Reconstruction & Renovation

Restoration of Chicago’s Union Station Great Hall completes

Goettsch Partners designed the project.


By David Malone, Associate Editor | February 7, 2019
Great Hall skylight and interior after restoration

All images © Amtrak, courtesy Goettsch Partners

Chicago’s Union Station Great Hall, originally designed in 1925, needed substantial repairs due to water leakage and deterioration due to flaws in the original design. The Great Hall restoration project was the most recent in a series of Union Station restoration projects that began in 2010.

Goettsch Partners began the $22-million dollar Great Hall project over three years ago. The design team renovated the station’s 219-foot-long skylight, which experienced extensive moisture damage over the past several decades. An energy-efficient, modern skylight was designed and built five feet above the original cast-iron skylight. The new skylight comprises steel and 858 panes of clear, high-efficiency glass that protects the building while brightening the Great hall interiors with 50% more natural daylight than before.

 

 

Chicago Union Station Great hall East Elevation

See Also: Art-focused hotel will be the first to open in the Dallas Arts District

 

Other aspects of the restoration included structural improvements, new plumbing, plaster repair, restored ornamentation, and new lighting. The architectural team removed layers of paint to reveal the original coloration of the Great Hall’s ornate plasterwork and then restored the station to its original color scheme. Additionally, a new elevator was installed and 24 ceiling chandeliers and two figural sculptures were restored.

Workers used a suspended work deck with swing stages, as opposed to conventional floor-mounted scaffolding, so work could proceed without interrupting the commute of the 120,000 daily travelers.

 

Old skylight and new skylight for Union Station Great Hall

 

New Great Hall skylight

Related Stories

| Feb 17, 2012

Tremco Inc. headquarters achieves LEED Gold certification

Changes were so extensive that the certification is for new construction and not for renovation; officially, the building is LEED-NC.

| Feb 16, 2012

Summit Design + Build begins build-out for Emmi Solutions in Chicago

The new headquarters will total 20,455 sq. ft. and feature a loft-style space with exposed masonry and mechanical systems, 15 foot clear ceilings, two large rooftop skylights and private offices with full glass partition walls.

| Feb 15, 2012

Englewood Construction announces new projects with Destination Maternity, American Girl

Englewood’s newest project for Wisconsin-based doll retailer American Girl, the company will combine four vacant storefronts into one large 15,000 square-foot retail space for American Girl.

| Feb 14, 2012

SAIC selected for architectural and engineering design services at Lajes Field, Azores

SAIC’s services will include a broad variety of new construction projects and maintenance and repair projects

| Feb 8, 2012

World’s tallest solar PV-installation

The solar array is at the elevation of 737 feet, making the building the tallest in the world with a solar PV-installation on its roof.

| Feb 6, 2012

Kirchhoff-Consigli begins Phase 2 renovations at FDR Presidential Library and Museum

EYP Architecture & Engineering is architect for the $35 million National Archives Administration project.

| Feb 2, 2012

Fire rated glazing helps historic university preserve its past

When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.



Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021