One of the biggest issues in healthcare reconstruction is balancing the construction work with the hospital’s need to maintain 24/7 operations. As the nation’s 14th largest healthcare construction firm (according to BD+C’s 2016 Giants 300 rankings), Clark Construction Group is well versed in dust- and infection-control techniques.
On a recent renovation project at Inova Health System’s Fair Oaks (Va.) Hospital, Clark pilot-tested a reusable infection-control barrier that greatly minimized the amount of hours and labor required to assemble and disassemble the barrier walls. The Edge Guard system (www.edge-guard.com) was specified for several hundred linear feet of infection-control partitions that needed to be built and disassembled during several phases.
Clark’s Senior Superintendent Brian Hetherington desired something more efficient than traditional drywall assemblies. He says Edge Guard was a great solution because it could be assembled and disassembled by virtually any project team member using just a ladder, and without generating dust. The system also integrates ICRA barrier requirements, including pressure monitoring, notices, security, and filtration.
Read about more innovations from BD+C's 2016 Great Solutions Report
Related Stories
Great Solutions | Apr 6, 2017
Phone booths for the 21st century
Spotting a phone booth on a public street may not become any less rare, but they may soon become fixtures in the modern office.
Great Solutions | Mar 8, 2017
Pop-out balcony is a breath of fresh air for stuffy hotel rooms and apartments
In less than one minute, Bloomframe transforms from an insulated picture window to an open balcony.
Great Solutions | Feb 3, 2017
Drone-based hospitality concept looks to make nomads of us all
Driftscape could take the resort industry to places no hotel has ventured before.
AEC Tech | Sep 6, 2016
Innovation intervention: How AEC firms are driving growth through R&D programs
AEC firms are taking a page from the tech industry, by infusing a deep commitment to innovation and disruption into their cultural DNA.
Great Solutions | Aug 23, 2016
GBBN designers take on wellness research
In a new research paper, three healthcare specialists present factors that contribute to a psychological state that is receptive to healing.
Great Solutions | Aug 23, 2016
Visual energy model database demystifies net-zero design
Diamond Schmitt Architects’ ecoMetrics tool allows its designers to quickly analyze solutions based on models from 44 LEED-certified projects.
Great Solutions | Aug 23, 2016
Novel construction approach speeds K-12 school projects
The Folia system uses pre-engineered components to deliver school buildings at 20% less cost.
Great Solutions | Aug 23, 2016
Mobile emergency room arrives just in time for Alabama hospital
The MED-1 Mobile Hospital Unit serves as a lower-cost solution during construction of new ED.
Great Solutions | Aug 23, 2016
Durable coffeemaker brings a bit of comfort to job sites
The CoffeeBoxx is lightweight rust proof, dust proof, water resistant, and ultra durable.
Great Solutions | Aug 23, 2016
Reclaimed wood paneling adds color to retail and hospitality projects
Colorburst panels are available in four stock options—Robin Egg Blue, Viridian Green, Haute Pink, and Cascade White—as well as custom colors.