Ridge Development, the industrial development arm of Transwestern Development Co., has recently broken ground on a 686,300-sf industrial space about 30 miles northwest of Charleston in Jedburg, S.C. The 63-acre site is located at Interstate 26 and Jedburg Road and will feature two state-of-the-art speculative industrial buildings.
The Class A buildings, which will be located in the Charleston Logistics Center, are designed for multitenant use with each building providing 343,150 sf of space. The rear-loading buildings will feature 32-foot clear height, 54-by-48-foot column spacing, a 60-foot staging bay, ESFR, 64 dock doors, two drive-in doors, 202 car parking spaces, and 76 truck parking spaces.
The center’s access to I-26 for both truck transportation and employees will help the industrial site stand out from competing parks, according to Steve Kros, Executive Vice President, Ridge. The two buildings are expected to be completed by first quarter 2018.
Related Stories
| Nov 5, 2012
Brasfield & Gorrie awarded new steel processing facility for Kloeckner Metals
The construction will take place on a 16-acre greenfield site at ThyssenKrupp Industrial Park in Calvert.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Apr 25, 2012
Bubble skyscraper design aims to purify drinking water
The Freshwater Skyscraper will address the issue of increasing water scarcity through a process known as transpiration
| Dec 19, 2011
Survey: Job growth driving demand for office and industrial real estate in Southern California
Annual USC Lusk Center for Real Estate forecast reveals signs of slow market recovery.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.
| Oct 3, 2011
Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia
The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.