ICL, a global specialty minerals company with offices in Tel Aviv, Israel, and St. Louis, broke ground earlier this month on a $400 million battery materials manufacturing plant that, when it opens in 2025, will help meet demand from energy storage, electric vehicle, and clean-energy industries for products made in the U.S.
ICL’s investment in this plant was augmented by a $197 million grant from the U.S. Department of Energy, whose Secretary, Jennifer Granholm, was among the dignitaries attending the August 8 groundbreaking, who included Missouri Governor Mike Parson, and Jarod Boyd, Chief of Staff to St. Louis Mayor Tishaura Jones.
McCarthy Building Companies is the general contractor for the 140,000-sf facility, said to be the first commercial-scale plant of its kind in the U.S. Hargrove Engineers & Consultants is providing architecture, design and all engineering services outside of CE, which Castle is covering.
The facility is expected to produce 30,000 metric tons of lithium iron phosphate (LFP). (E Source, a research, consulting, and data sciences firm, projects global demand for iron phosphate-based cathode active materials to reach 3 million tons by 2031, with a market value of $40 billion.)
The plant will be situated on ICL’s existing Carondelet campus in St. Louis, and construction is expected to create between 800 and 900 union contractor jobs. ICL is also working with Aleees, a Taiwan-based LFP materials producer, to establish a localized, integrated, and sustainable LFP supply chain for U.S.-based customers.
Larger-scale plants under construction
The electrification movement, spurred by passage of the Inflation Reduction Act, is emerging as a building boom. Other plants under construction include LG Energy Solutions’ $1.7 billion, 1-million-sf electric vehicle battery manufacturing facility in Holland, Mich., which should be completed by next April. LG Energy Solutions benefits from a $189 million incentives package from the Michigan Economic Development Corporation.
Last May, LG Energy Solutions and Hyundai Motor Group announced plans to build a $4.3 billion EV battery plant in Bryan County in Georgia that is expected to bring 3,000 new jobs by the end of 2025, when it will start producing 300,000 batteries per year. The plant will be near Hyundai’s Metaplant America factory, also under construction, that will produce Hyundai-, Genesis-, and Kia-branded electric vehicles.
BMW Group’s 1-million-sf, $700 million high-voltage battery assembly plant, in Woodruff, S.C., broke ground last June. The new plant, on 315 acres, will support BMW’s car factory in Spartanburg, S.C. It is designed to be solar-ready, and will use collected rainwater to reduce its water consumption. The Woodruff plant is part of BMW’s latest $1.7 billion investment in South Carolina, and its construction includes a technology building, a cafeteria, a fire department, and energy center.
The Woodruff plant will get its battery cells from Tennessee-based Envision AESC US, which is building a $810 million, 1.5-million-sf cell plant in Florence, S.C.
Last April, General Motors and South Korea-based Samsung SDI revealed plans to invest more than $3 billion in an EV battery cell plant in the U.S. The plant, to be located in Carlisle, Ind., is expected to begin operations in 2026 and create 1,700 jobs, according to both companies.
GM and LG recently completed a battery-cell plant near Warren, Ohio, and reportedly have battery cell plants in the works in Tennessee and Michigan.
Related Stories
| Nov 5, 2012
Brasfield & Gorrie awarded new steel processing facility for Kloeckner Metals
The construction will take place on a 16-acre greenfield site at ThyssenKrupp Industrial Park in Calvert.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Apr 25, 2012
Bubble skyscraper design aims to purify drinking water
The Freshwater Skyscraper will address the issue of increasing water scarcity through a process known as transpiration
| Dec 19, 2011
Survey: Job growth driving demand for office and industrial real estate in Southern California
Annual USC Lusk Center for Real Estate forecast reveals signs of slow market recovery.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.
| Oct 3, 2011
Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia
The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.